HAMILTON COUNTY SR-8 (RINGGOLD RD.) Utility Work eastbound from LM 1.29 to LM .8: Mobile shoulder and lane closures on Ringgold Road as crews transition work zones between Mack Smith Road and Camp Jordan Parkway. This will also impact the Northbound and Southbound on ramps to I-75. Motorists should reduce speed and be prepared to stop. Signage, cones, and flaggers will be present, 09/13/22 through 10/12/22 from 9 AM – 2 PM. [2019-578]
HAMILTON COUNTY I-24 interchange improvement at SR-2 (US-11, US-41, US-72, Broad Street) and SR-58 (Market Street): Williams Street is closed to all traffic at the I-24 underpass to support the installation of new storm drainage structures for the new frontage road. Traffic will still be able to access the ramps to I-24 and US-27, but no through traffic will be allowed on Williams Street between West 21st Street and West 25th Street. Traffic will detour around the closure via West 21st Street and Broad Street. Signs will be posted. The contractor will be working on new bridge construction, storm drainage structures, and utility relocation. Chestnut Street is closed at the I-24 underpass and will remain closed until the construction of bridge #2 is complete. Detour routes are posted. The US-27 N on-ramp at William Street has been closed and will remain closed until the new alignment for this ramp is completed. There will be marked detour signs to use the Broad St. US-27 on-ramp. On Thursday, October 6 and Monday October 10th, the contractor will close the inside lane on I-24 West from MM176-178 from 9 PM-6 AM so that the contractor can pour the median barrier wall on I-24, weather permitting. On Sunday, October 9th the contractor will close the right lane on I-24 East from MM176-178 so that the contractor can restripe the new exit off I-24 to Broad St. This work will take place from 9 PM-6 AM. Beginning Sunday, October 9 from 9 PM -6 AM, the contractor will be opening the new Broad Street exit off I-24 and closing the existing exit to the Broad Street that is off the US27 South exit. Traffic from US27 S that needs to get to Broad Street will have to use the Williams Street exit. There will be detour signs to direct traffic off the Williams St. exit to Broad St. Also, with the new exit there will be a new signal at the intersection of Broad St. With the new traffic pattern, drivers needs to be aware of the changes.
[Wright Brothers Construction Company, Inc./Curtis/CNU011]
HAMILTON COUNTY I-24 TDOT Bridge Inspection both directions from MM 178 to MM 185: Beginning on 10/10/22 through 10/12/22, a mobile right shoulder closure operation utilizing an attenuator truck will take place in order to perform structure inspections. Work will take place from 7:30 AM to 5:00 PM.
HAMILTON COUNTY I-75 concrete repair from MM 6.6 to MM 12.8: During this reporting period, the contractor will be having lane closures in both the Northbound and Southbound directions on I-75 from 9 PM-6 AM. During these lane closures, the contractor might have to temporary close some of the ramps so that they can work on the ramp.
[Summers-Taylor, Inc./Curtis/CNW046]
HAMILTON COUNTY SR-153 resurfacing from LM 3.5 to LM 3.7, including bridge expansion joint repair on the railroad overpass bridge (LM 3.6); SR-2 resurfacing on (US-11, US-64) from the NB interstate ramps (LM 20.6) to the Bradley County line (LM 24.4): During this reporting period, the contractor will be performing resurfacing operations between 7 PM and 6 AM. Also, starting 09/23/2022 there will be intermittent lane closures on SR-153, LM 3.6 to perform the bridge expansion joint repairs between 7 PM and 6 AM. The traveling public is encouraged to be aware of safety personnel and construction vehicles entering and exiting the jobsite.
[Wright Brothers Construction Company, Inc./Osbonlighter/CNW131]
HAMILTON COUNTY SR-17 resurfacing from the Georgia state line (LM 0) to SR-2 (US-11, US-64, US-72, LM 2.2): Starting during this reporting period, the contractor will have intermittent lane closures as they start working on this project.
[Talley Construction Company, Inc./Curtis/CNW213]
HAMILTON COUNTY SR-2 (LEE HWY.) Utility Work eastbound at LM 21.8: Shoulder and single lane closures between Ooltewah Ringgold Road and Edgemon Road. Motorists should reduce speed and be prepared to stop. Trucks, signage, drums/cones, and flaggers will be present, 10/06/22 from 9 am – 2 pm, with a rain date of 10/10/2022. [2022-627]
HAMILTON COUNTY SR-2 (LEE HWY.) Utility Work eastbound from LM 19.86 to LM 19.87: Shoulder and single lane closures at Tyner Road and Lee Hwy. Motorists should reduce speed and be prepared to stop. Trucks, signage, drums/cones, and flaggers will be present, 10/06/22 from 9 am – 2 pm, with a rain date of 10/13/2022. [2022-650]
HAMILTON COUNTY SR-29 (US-27) slide repair between LM 29 and LM 30: During this reporting period, TDOT Maintenance and contract forces will have traffic reduced to one lane in each direction on US-27 (SR-29) to continue work on a new retaining wall and slope stabilization. Motorists are advised to reduce speed in the work zone.
[GeoStabilization International, LLC /Maint – Chattanooga/MAINT]
HAMILTON COUNTY SR-317 (Apison Pike) improvement project from SR-321 (Ooltewah-Ringgold Road) to east of Layton Lane: Lane closures and flagging operations will be required on SR-317, Apison Pike, for utility work. The flagging operations will be performed on 10/06/22, 10/07/22, 10/08/22, 10/10/22, 10/11/22, and 10/12/22 from 7 AM to 1 PM and 3 PM to 7 PM. Closures will last about 2 hours per location. The contractor will have intermittent flagging operations during daytime non-peak hours for utility work, delivery of materials and equipment. A portion of Tucker Road has been closed from Spalding Drive to 5400 Tucker Road to allow for grading and utility operations. Starting on 10/08/22, traffic will be shifted onto the new alignment of SR-317 by the existing intersection of Apison Pike and University Drive and by Eastview Terrace. The tie-in of College Drive to SR-317 will be closed and a detour route will also be set up.
[Wright Brothers Construction Company, Inc./Osbonlighter/CNT336]
HAMILTON COUNTY SR-317 (APISON PK.) Utility Work westbound at LM 6.25: Shoulder and single lane closures from Meridian Drive and Branston Drive. Motorists should reduce speed and be prepared to stop. Trucks, signage, drums, and flaggers will be present, 10/10/22 from 9 am – 3 pm. [2022-649]
HAMILTON COUNTY SR-317 (BONNY OAKS DR.) Utility Work both directions from LM 2.84 to LM 2.91: Shoulder and lane closures from N. Bishop Drive and Bonnyshire Drive. Motorists should reduce speed and be prepared to stop. Trucks, signage, cones, and flaggers will be present, 10/06/22 through 10/12/22 from 9 am – 2 pm. [2022-143]
HAMILTON COUNTY SR-317 (BONNY OAKS DR.) Utility Work westbound from LM 4.55 to LM 4.54: Shoulder and single lane closures from Lee Hwy and Silverdale Road. Motorists should reduce speed and be prepared to stop. Trucks, signage, drums, and flaggers will be present, 09/22/22 through 10/21/22 from 9 am – 2 pm. [2022-475]
HAMILTON COUNTY SR-58 slide repair near LM 17: During this reporting period, the contractor will have SR-58 Northbound lane at LM 17 down to 1 lane during the duration of the project as the contractor starts working on the project.
[Talley Construction Company, Inc./Curtis/CNW199]
HAMILTON COUNTY SR-8 (E. MAIN ST.) Utility Work eastbound from LM 6.01 to LM 5.92: Shoulder and single lane closures between S. Lyerly Street and S. Watkins Street. Motorists should reduce speed and be prepared to stop. Trucks, signage, drums/cones, and flaggers will be present, 10/10/22 from 9 am – 2 pm, with a rain date of 10/12/2022. [2022-651]
HAMILTON COUNTY SR-8 (US-127) construction near Palisades Road (LM 15.2) to near Sunset Drive (LM 15.4): Starting on Thursday of this reporting period, the contractor will be closing the right lane going up Signal Mountain Road. The lane will be closed from LM 15 (about 1/2 Mi from Palisades Road) to past Sunset Drive. This closure will be in effect for several months during the duration of this project.
[Wright Brothers Construction Company, Inc./Curtis/CNW001]
HAMILTON COUNTY The construction of an S.I.A. to VW: The contractor will be performing operations at the intersection connecting the S.I.A. route, Ferdinand Piech Way, & Volkswagen Dr. The new 4-way signalized intersection has begun operation & traffic has been shifted to the new alignment. Ferdinand Piech Way will still be closed to through traffic. Traveling public should be cautious of the new traffic pattern in effect including a lowered speed limit. The traveling public should also be alert to the entrance and exit of construction vehicles & staff on and around the jobsite and the connecting roadways. Flaggers may be onsite directing traffic.
[Talley Construction Company, Inc./Osbonlighter/CNU221]