HAMILTON COUNTY I-24 interchange improvement at SR-2 (US-11, US-41, US-72, Broad Street) and SR-58 (Market Street): Williams Street is closed to all traffic at the I-24 underpass to support the installation of new storm drainage structures for the new frontage road. Traffic will still be able to access the ramps to I-24 and US-27, but no through traffic will be allowed on Williams Street between West 21st Street and West 25th Street. Traffic will detour around the closure via West 21st Street and Broad Street. Signs will be posted. The contractor will be working on new bridge construction, storm drainage structures, and utility relocation. Chestnut Street is closed at the I-24 underpass and will remain closed until the construction of bridge #2 is complete. Detour routes are posted. The US-27 NB on-ramp at William St. has been closed and it will be closed until the new alignment for this ramp is completed. There will be marked detour signs to use the Broad St. US-27 on-ramp. During this reporting period, there will be 1 lane closed on Market St from 9 AM-3 PM. Also, on during this reporting period, there will be lanes closed in both directions on Broad ST from 9 AM-3 PM so that the contractor can work on the median on Broad St.
[Wright Brothers Construction Company, Inc./Curtis/CNU011]
HAMILTON COUNTY I-24 TDOT Bridge Inspection both directions from MM 178.0 to MM 182.0: On Thursday, 09/01/22, Tuesday, 09/06/22, and Wednesday, 09/07/22, a mobile right shoulder closure operation utilizing an attenuator truck will take place in order to perform structure inspections. Work will take place from 7:30 AM – 5:00 PM.
HAMILTON COUNTY I-75 concrete repair from MM 6.6 to MM 12.8: During this reporting period, the contractor will be having lane closures in both the Northbound and Southbound directions on I-75 from 9 PM-6 AM. During these lane closures, the contractor might have to temporary close some of the ramps so that they can work on the ramp.
[Summers-Taylor, Inc./Curtis/CNW046]
HAMILTON COUNTY SR-148 (LOOKOUT MTN. SCENIC HWY.) Utility Work both directions at LM 0.39: Shoulder and single lane closures from Fleetwood Drive West to Franklin Road. Motorists should reduce speed and be prepared to stop. Trucks, signage, and portable traffic signal will be present, 08/29/22 through 09/02/22 from 9 am – 2 pm. [2022-509]
HAMILTON COUNTY SR-153 resurfacing from LM 3.5 to LM 3.7, including bridge expansion joint repair on the railroad overpass bridge (LM 3.6); SR-2 resurfacing on (US-11, US-64) from the NB interstate ramps (LM 20.6) to the Bradley County line (LM 24.4): During this reporting period, the contractor will be performing resurfacing operations between 7 PM and 6 AM. The traveling public is encouraged to be aware of safety personnel and construction vehicles entering and exiting the jobsite.
[Wright Brothers Construction Company, Inc./Osbonlighter/CNW131]
HAMILTON COUNTY SR-17 resurfacing from the Georgia state line (LM 0.0) to SR-2 (US-11, US-64, US-72) (LM2.2): Starting during this reporting period, the contractor will have intermittent lane closures as they start working on this project.
[Talley Construction Company, Inc./Curtis/CNW213]
HAMILTON COUNTY SR-2 (CUMMINGS HWY.) Utility Work eastbound from LM 0 to LM 0.65: Shoulder and single lane closures from Nicholas Road to Kelly Ferry Road. Motorists should reduce speed and be prepared to stop. Trucks, signage, flaggers, and cones will be present, 09/07/22 through 09/08/22 from 9 am – 2 pm with a rain date of 09/12/22. [2022-517]
HAMILTON COUNTY SR-29 (US-27) slide repair between LM 29 and LM 30: During this reporting period, TDOT maintenance and contract forces will have traffic reduced to one lane in each direction on US-27 (SR-29) to continue work on a new retaining wall and slope stabilization. Motorists are advised to reduce speed in the work zone. RESTRICTIONS: Max horizontal clearance 14′.
[GeoStabilization International, LLC /Maint – Chattanooga/MAINT]
HAMILTON COUNTY SR-317 (Apison Pike) improvement project from SR-321 (Ooltewah-Ringgold Road) to east of Layton Lane: Lane closures and flagging operations will be required on SR-317, Apison Pike, to install power poles and transfer lines. The flagging operations will be performed on 09/01/22, 09/02/22, 09/05/22, 09/06/22, and 09/07/22 from 7 AM to 1 PM and 3 PM to 7 PM. Closures will last about 2 hours per location. The contractor will have intermittent flagging operations during daytime non-peak hours for utility work, delivery of materials and equipment. A portion of Tucker Road has been closed from Spalding Drive to 5400 Tucker Road to allow for grading and utility operations. A portion of Chestnut Creek Road has been shifted to its new alignment to allow for grading and utility operations.
[Wright Brothers Construction Company, Inc./Osbonlighter/CNT336]
HAMILTON COUNTY SR-319 (Amnicola Highway) bridge repair over SR-153: Contractor will be performing bridge repair operations on the Amnicola (SR-319) bridge over SR-153. During this project, SR-319 will have lane closures in place. During repair operations at least one lane of traffic shall remain open in both directions. Bridge repair over 153 will be performed between 6am & 6pm. Additionally, there will be nightly lane closures starting 8/21/2022 to 8/25/2022 between the hours of 7pm & 6am. Motorists are advised to use caution in this vicinity and remain aware of construction activities.
[Mid-State Construction Company, Inc./Osbonlighter/CNV053]
HAMILTON COUNTY SR-319 (AMNICOLA HWY.) Utility Work westbound at LM 1.33: Shoulder and west bound turn lane into Chattanooga State closures. Motorists should reduce speed and be prepared to stop. Trucks, signage, cones, and flaggers will be present, 09/07/22 through 09/09/22 from 9 am – 2 pm, with a rain date of 09/12/22. [2022-550]
HAMILTON COUNTY SR-58 slide repair near LM 17: During this reporting period, the contractor will have SR58 Northbound lane at LM 17 down to 1 lane during the duration of the project as the contractor starts working on the project.
[Talley Construction Company, Inc./Curtis/CNW199]
HAMILTON COUNTY SR-8 (E. MAIN ST.) Utility Work both directions from LM 6.40 to LM 6.39: Eastbound and Westbound inside lane closures from S. Orchard Knob Ave to S. Hawthorne St. Motorists should reduce speed and be prepared to stop. Trucks, signage, and cones will be present, 09/01/22 from 9 am – 5 pm. [2019-543]
HAMILTON COUNTY SR-8 (RINGGOLD RD.) Utility Work eastbound from LM 1.29 to LM .8: Mobile shoulder and lane closures on Ringgold Road as crews transition work zones between Mack Smith Road and Camp Jordan Parkway. This will also impact the Northbound and Southbound on ramps to I-75. Motorists should reduce speed and be prepared to stop. Signage, cones, and flaggers will be present, 09/07/22 through 09/14/22 from 9am – 2pm. [2019-578]
HAMILTON COUNTY SR-8 (RINGGOLD RD.) Utility Work westbound at LM 1.25: Shoulder and single lane closures from I-75 off ramp to N. Mack Smith Road. Motorists should reduce speed and be prepared to stop. Trucks, signage, and cones will be present, 09/01/22 from 9 am – 2 pm with a rain date of 09/06/22. [2022-121]
HAMILTON COUNTY SR-8 (SIGNAL MOUNTAIN BLVD.) Utility Work both directions from LM 15.9 to LM 16.3: NIGHTTIME Mobile shoulder and single lane closures from North of Shoal Creek Road to Sunset Drive. Motorists should reduce speed and be prepared to stop. Trucks, signage, cones, and flaggers will be present, 08/29/22 through 09/02/22 from 9 pm – 4 am. [PIN 124080.00]
HAMILTON COUNTY The construction of an S.I.A. to VW: The contractor will be performing operations at the intersection connecting the S.I.A. route, Ferdinand Piech Way, & Volkswagen Dr. The new 4-way signalized intersection has begun operation & traffic has been shifted to the new alignment. Ferdinand Piech Way will still be closed to through traffic. Traveling public should be cautious of the new traffic pattern in effect including a lowered speed limit. The traveling public should also be alert to the entrance and exit of construction vehicles & staff on and around the jobsite and the connecting roadways. Flaggers may be onsite directing traffic.
[Talley Construction Company, Inc./Osbonlighter/CNU221]