HAMILTON COUNTY I-24 interchange improvement at SR-2 (US-11, US-41, US-72, Broad Street) and SR-58 (Market Street): Williams Street is closed to all traffic at the I-24 underpass to support the installation of new storm drainage structures for the new frontage road. Traffic will still be able to access the ramps to I-24 and US-27, but no through traffic will be allowed on Williams Street between West 21st Street and West 25th Street. Traffic will detour around the closure via West 21st Street and Broad Street. Signs will be posted. The contractor will be working on new bridge construction, storm drainage structures, and utility relocation. Chestnut Street is closed at the I-24 underpass and will remain closed until the construction of bridge #2 is complete. Detour routes are posted. The US-27 NB On-Ramp at William St. has been closed and it will be closed until the new alignment for this ramp is completed. There will be marked detour signs to use the Broad St. US-27 on-ramp. On Monday and Tuesday night of this reporting period from 9 PM-6 AM, there will be a lane closed on I24 EB from MM1782 to 179 to install barrier wall and attenuator. On Friday from 9 AM-3 PM, the contractor will have 1 lane closed in both directions on Broad St as they work to install the new proposed striping in this area. The contractor will be striping the new turn lanes on Broad St per the project plans.
[Wright Brothers Construction Company, Inc./Curtis/CNU011]
HAMILTON COUNTY I-75 concrete repair from MM 6.6 to MM 12.8: During this reporting period, there will be lane closures on I-75 Northbound from 9 PM-6 AM starting at MM 12.6 to MM 6.6. The contractor will be closing lanes #3 and #4 (the 2 outside lanes) during these lane closures on I-75 Northbound. Also, during this reporting period, the contractor possibly have lane closures in Southbound lanes close to Exit 11 bridge. The contractor will start having weekend closures on I75 Southbound starting at MM12.6 to MM6.6 on June 10th starting at 9 PM and opening up no later than 6 AM Monday June 13. During this weekend closure there will be 3 outside lanes closed, with 1 lane of traffic in lane #1(Inside Lane) and another lane of traffic using the shoulder as the contractor will be removing certain sections of the concrete roadway and then pouring it back. There will be 2 lanes of traffic opened during this operation this weekend During this operation, it is recommended that the motoring public find alternate routes in this area because there will be a possibility of long waits as this work is going on. This is the start of weekly weekend closures on this project that will be done for the next 2 months.
[Summers-Taylor, Inc./Curtis/CNW046]
HAMILTON COUNTY I-24 Utility Work eastbound from MM 174 to MM 175: There will be a single Eastbound lane closure along I-24 beginning near Exit 174 (Lookout Valley/Lookout Mtn) and ending near Exit 175 (Browns Ferry Rd). Arrow boards, signage and flaggers will be on site during the aerial construction. Motorists should reduce speed and be prepared to stop while remaining alert for personnel and equipment traveling through the work zone area. Work to be performed Sunday 06/12/22 between 7 am and 11 am with a rain date of 06/26/22. There will be a single Westbound lane closure along I-24 beginning near Exit 175 (Browns Ferry Rd) and ending near Exit 174 (Lookout Valley/Lookout Mtn). Arrow boards, signage and flaggers will be on site during the aerial construction. Motorists should reduce speed and be prepared to stop while remaining alert for personnel and equipment traveling through the work zone area. Work to be performed Sunday 06/26/22 between 7 am and 11 am with a rain date of 07/10/22. [2021-832]
HAMILTON COUNTY SR-153 (STATE HWY. 153) Utility Work both directions from LM 10.85 to LM 10.82: Nighttime lane closures on SR-153 at the Grubb Road intersection near Academy Sports. There will be a single northbound and southbound lane closure along with intermittent traffic stoppages of all lanes. Law enforcement officers, arrow boards, signage and flaggers will be on site during the aerial construction. Motorists should reduce speed and be prepared to stop while remaining alert for personnel and equipment traveling through the work zone area. This work will be done Thursday 06/09/22 at 11:30 pm to Friday 06/10/22 at 5:30 am with a rain date of 06/16/22 at 11:30 pm to Friday 06/17/22 at 5:30am. [2022-325]
HAMILTON COUNTY SR-2 (LEE HWY.) Utility Work southbound at LM 15.43: Shoulder and single lane closures between E. Brainard Road and Aiken Road. Motorists should reduce speed and be prepared to stop. Signage, cones, and flaggers will be present, 05/26/22 through 06/15/22 from 9 am – 2 pm. [2022-305]
HAMILTON COUNTY SR-321 (OOLTEWAH-RINGGOLD RD.) Utility Work both directions at LM 1.96: Shoulder and single lane closures at the roundabout of Ooltewah Ringgold Road and Standifer Gap Road. Motorists should reduce speed and be prepared to stop. Signage, cones, and flaggers will be present, 05/26/22 through 06/26/22 from 10 am – 2 pm. [2021-782]
HAMILTON COUNTY SR-8 (MARKET ST.) TDOT Bridge Inspection both directions from LM 9.65 to LM 10.13: On Sunday, 06/12/22, the Market Street Bridge will be closed both directions for the quarterly lift operation from 8 AM – 1 PM. Detours will be in place.
HAMILTON COUNTY SR-8 (RINGGOLD RD.) Utility Work eastbound at LM 1.10: Shoulder closure only between McDonald Road and I-75 South on ramp. Motorists should reduce speed and be aware of personnel and equipment in the area. Signage, barrels, and flaggers will be present, 06/09/22 through 06/15/22 from 8:30 am – 5:30 pm. [2019-578]
HAMILTON COUNTY SR-8 (RINGGOLD RD.) Utility Work westbound from LM 1.65 to LM 1.25: Shoulder and single lane closures from the intersection of Ringgold Road and I-75 to Prater Road. Motorists should reduce speed and be prepared to stop. Trucks, signage, cones, and flaggers will be present, 06/09/22 through 06/30/22 from 9 am – 2 pm. [2022-121 & 2022-249]
HAMILTON COUNTY SR-8 (TAFT HWY.) Utility Work both directions from LM 22.01 to LM 22.2: Shoulder and single lane closures between Fairmount Road and Dowler Lane. Motorists should reduce speed and be prepared to stop. Signage, cones, and flaggers will be present, 02/15/22 through 06/22/22 from 9 am – 2 pm. [2021-636]
HAMILTON COUNTY SR-29 (US-27) slide repair between LM 29 and LM 30: The travel lanes on US-27/SR-29 in Hamilton County between LM 29 and LM 30 will be reduced to one lane of traffic in each direction for the duration of the slide repair. Loads over 14’ wide will have to find an alternate route. [TDOT/Wallace/Maint]
[GeoStabilization International, LLC /Maint – Chattanooga/MAINT]
HAMILTON COUNTY SR-317 (Apison Pike) improvement project from SR-321 (Ooltewah-Ringgold Road) to east of Layton Lane: Lane closures and flagging operations will be required on SR-317, Apison Pike, to install power poles and transfer lines. The flagging operations will be performed on 06/09/22, 06/10/22, 06/13/22, 6/14/22, and 06/15/22 from 7 AM to 1 PM and 3 PM to 7 PM. Closures will last about 2 hours per location. The contractor will have intermittent flagging operations during daytime non-peak hours for utility work, delivery of materials and equipment. A portion of Tucker Road has been closed from Spalding Drive to 5400 Tucker Road to allow for grading and utility operations. Flagging will be required on Spalding Drive for Bridge 1 operations.
[Wright Brothers Construction Company, Inc./Osbonlighter/CNT336]
HAMILTON COUNTY SR-319 (Amnicola Highway) bridge repair over SR-153: Contractor will be performing bridge repair operations on the Amnicola (SR-319) bridge over SR-153. During this project, SR-319 will have lane closures in place. During repair operations at least one lane of traffic shall remain open in both directions. Bridge repair over 153 will be performed between 6am & 6pm. Motorists are advised to use caution in this vicinity and remain aware of construction activities.
[Mid-State Construction Company, Inc./Osbonlighter/CNV053]
HAMILTON COUNTY The construction of an S.I.A. to VW: The contractor will be performing operations at the intersection connecting the S.I.A. route, Ferdinand Piech Way, & Volkswagen Dr. The new 4-way signalized intersection has begun operation & traffic has been shifted to the new alignment. Ferdinand Piech Way will still be closed to through traffic. Traveling public should be cautious of the new traffic pattern in effect including a lowered speed limit. The traveling public should also be alert to the entrance and exit of construction vehicles & staff on and around the jobsite and the connecting roadways. Flaggers may be onsite directing traffic.
[Talley Construction Company, Inc./Osbonlighter/CNU221]