HAMILTON COUNTY I-24 interchange improvement at SR-2 (US-11, US-41, US-72, Broad Street) and SR-58 (Market Street): Beginning Monday 01/24/2022 at 9 AM, the contractor will close Williams Street to all traffic at the I-24 underpass. Traffic will still be able to access the ramps to I-24 and US-27, but no through traffic will be allowed on Williams Street between West 21st Street and West 25th Street. Traffic will detour around the closure via West 21st Street and Broad Street. Signs will be posted. The contractor will be working on new bridge construction, storm drainage structures, and utility relocation. Chestnut Street is closed at the I-24 underpass and will remain closed until the construction of bridge #2 is complete. Detour routes are posted.
[Wright Brothers Construction Company, Inc./Wagner/CNU011]
HAMILTON COUNTY I-75 at I-24 Interchange Reconstruction: All roadways and ramps are in their final alignments. The contractor is now working on final items and traffic should still use caution traveling throughout the interchange. The final work items will mostly consist of off shoulder work/median work. Lane closures are planned for Sunday nights through Thursday nights between 9:00 PM and 6:00 AM to finish in roadway work. The speed limit will remain reduced to 45 MPH throughout the interchange until construction crews demobilize.
[C.W. Matthews Contracting Company, Inc./Blevins/DB1801]
HAMILTON COUNTY SR-2 (E. 23RD ST.) Utility Work both directions from LM 9.53 to LM 11.33: Center lane closure between Dodds Avenue and Lynbrook Avenue. Motorists should reduce speed and be prepared to stop. Message boards, signage, cones, and flaggers will be present, 01/18/22 through 01/26/22 from 9 am – 2 pm. [2019-507]
HAMILTON COUNTY SR-38 (BIRMINGHAM HWY.) Utility Work both directions at LM 0.46: Shoulder and single lane closures between Wauhatchie Pike and McGill Cemetery Road. Motorists should reduce speed and be prepared to stop. Message boards, signage, cones, and flaggers will be present, 01/24/22 through 02/02/22 from 9 am – 2 pm. [2022-007]
HAMILTON COUNTY SR-58 (ALTON PARK BLVD.) Utility Work both directions at LM 3.09: Shoulder and single lane closures between W 33rd Street and W 37th Street. Motorists should reduce speed and be prepared to stop. Signage, cones, and flaggers will be present, 01/10/22 through 02/02/22 from 9 am – 2 pm. [2021-794, 2021-869, 2021-902]
HAMILTON COUNTY SR-8 (E. MAIN ST.) Utility Work eastbound at LM 7.1: Shoulder and single lane closures between Fagan Street and Gulf Street. Motorists should reduce speed and be prepared to stop. Signage, cones, and flaggers will be present, 01/18/22 through 01/27/22 from 9 am – 4 pm. [2021-838]
HAMILTON COUNTY SR-2 (US-11, US-64) McCallie Tunnel cleaning: Due to the rain forecasted for Wednesday night, the contractor will be cleaning this tunnel on Thursday from 8 PM-6 AM. As this work is being done, there will be one lane closed in each direction.
[Diamond Specialized, Inc./Curtis/CNV157]
HAMILTON COUNTY SR-317 (Apison Pike) improvement project from SR-321 (Ooltewah-Ringgold Road) to east of Layton Lane: Lane closures and flagging operations will be required on SR-317, Apison Pike, to install power poles and transfer lines. The flagging operations will be performed on 01/20/22, 01/21/22, 01/24/22, 01/25/22, and 01/26/22 from 7 AM to 1 PM and 3 PM to 7 PM. Closures will last about 2 hours per location. The contractor will have intermittent flagging operations during daytime non-peak hours for utility work, delivery of materials and equipment. A portion of Tucker Road has been closed from Spalding Drive to 5400 Tucker Road to allow for grading and utility operations. One lane of Spalding Drive has been closed due to utility operations and is operated by a temporary traffic signal.
[Wright Brothers Construction Company, Inc./Osbonlighter/CNT336]
HAMILTON COUNTY SR-319 (Amnicola Highway) bridge repair over SR-153: The contractor will be performing bridge repair operations on the Amnicola (SR-319) bridge over SR-153. During this project, SR-319 will have lane closures in place & SR-153 may have lane closures as well. During repair operations at least one lane of traffic shall remain open in all directions. **Starting 1-20-22 through 1-24-22, there will be lane closures as traffic shifts into phase 2 on 1-25-22. There will be pavement markings and signage to alert traffic. **
[Mid-State Construction Company, Inc./Osbonlighter/CNV053]
HAMILTON COUNTY SR-8 (US-41, US-76) Bachman Tubes cleaning: On Thursday night of this reporting period, the contractor will close the tunnels from 8 PM-6 AM for cleaning. There will be a signed detour for traffic to follow to get around the closure.
[Diamond Specialized, Inc./Curtis/CNV157]
HAMILTON COUNTY The construction of an S.I.A. to VW: The contractor will be performing a grading operation at the roundabout connecting to S.I.A. route connecting Ferdinand Piech Way & Volkswagen Dr. Beginning 01/10/2022 the roundabout will have one lane closed along with connecting roadways during this period; one lane will be opened at all times. The traveling public should be alert to the entrance and exit of construction vehicles from the jobsite onto the connecting roadways. Flaggers may be onsite directing traffic. Traveling public should be cautious when traveling through of new traffic pattern in effect, as well as construction workers on site. It is suggested to follow the suggested speed limit that is posted for the area.
[Talley Construction Company, Inc./Osbonlighter/CNU221]