DISTRICT 29
HAMILTON COUNTY SR-153 resurfacing from north of SR-58 (LM 4.8) to the Tennessee River Bridge (LM 6.5): On Thursday,11/12 & Friday, 11/13 (9AM-3PM), there will be inside lane closures to support the installation of construction signs. Beginning Monday, 11/16 – Thursday (8PM -6AM) there will be nightly lane closures to support a milling & paving operation along SR153.
[Wright Brothers Construction Company, Inc./Micka/CNU196]
HAMILTON COUNTY SR-319 repair of the bridge over the Tennessee River and Riverpark Drive (LM 2.2): The contractor will be performing repair operations to the bridge that will require lane closures in both directions. Extra caution should be observed of trucks entering and exiting the work-zone. During this report period the outside shoulder and outside lane of each direction are closed. Traffic is shifted to the left in both directions. Additional flaggers will be present as needed.
[Mid-State Construction Company, Inc./Osbonlighter/CNU205]
HAMILTON COUNTY The tunnel cleaning of the McCallie Tunnel on US-11(US-64, SR-2), the Stringers Ridge Tunnel on US-127(SR-8), and the Bachman Tubes on US-41 (US-76, S.R.8): On Wed., 11/18/20 (8 PM to 6 AM), there will be a tunnel cleaning operation at the McCallie Tunnels. This will be supported by a flagging operation. Later that night, the Stringers Ridge Tunnel will be cleaned & supported by a signed detour. On Thursday, 11/19/2020 (8 PM to 6 AM), the East Ridge tunnels (Bachman tubes) will be cleaned & supported by a signed detour as each tunnel is cleaned.
[Diamond Specialized, Inc./Micka/CNU182]
HAMILTON COUNTY I-24 Replacement of Belvoir Ave. bridge over I-24 and I-24 bridges over Germantown Road near MM 183: Lane shifts are in place at North and South Terrace approaching the Belvoir Avenue Bridge, and on Germantown Road under the I-24 Bridge. Double lane closures on I-24 EB and single lane closures I-24 WB will be required on 11/12/20 and between 11/15/20 through 11/18/20 from 9 PM and 6 AM. Rolling roadblocks will be utilized on I-24 EB during the double lane closure on 11/12/20. Additionally, there will be single lane closures in the north and south directions of Germantown Road under the I-24 Bridge and at the intersections with North and South Terrace. These closures will occur on 11/12/20 and 11/13/20, and between 11/16/20 through 11/18/20 from 9 AM to 6 AM the following morning. Motorist should be aware of the Belvoir Avenue Bridge closure and detour that was put into place on 04/20/20. There is a 45 MPH speed limit reduction throughout the project corridor on I-24.
[Bell and Associates Construction, LP/Blevins/CMGC03]
HAMILTON COUNTY I-24 resurfacing from the Georgia State line to near the ramp to SR-2 (US-41, US-64, US-11, Cummings Hwy): There will continue to be some construction activity along I-24 EB/WB. This is likely to involve shoulders closures on occasions.
[Talley Construction Company, Inc./Micka/CNT374]
HAMILTON COUNTY I-75 at I-24 Interchange Reconstruction: Phase 2 traffic alignments have been implemented. Watch for trucks entering and exiting project. Traffic should expect multiple lane shifts traveling through the interchange. Lane closures will occur Sunday nights through Thursday nights between 9 PM and 6 AM at the following locations: I-75 NB MM 1, I-75 SB MM 3 and I-24 EB MM 184.0 Traffic pacing may occur throughout interchange Sunday nights through Thursday nights between 9 PM and 6 AM. Additionally, there may intermittent shoulder closures at various locations for access to the median and roadside areas. I-75 NB to I-24 WB split has been moved back 1500 feet from its previous location. Welcome Center traffic intending to use I-24 WB now, will have to detour on I-75 NB to Exit 3. Detailed detour information will be available at the Welcome Center. The Welcome Center will be closed 11/17/2020 from 9 PM to 6 AM the following morning. The speed limit has been reduced to 45 MPH throughout the interchange.
[C.W. Matthews Contracting Company, Inc./Blevins/DB1801]
HAMILTON COUNTY US-27 (I-124) widening from I-24/US-27 interchange to north of the Olgiati Bridge over the Tennessee River, including widening the Olgiati Bridge: Work on this project continues with activities occurring in the median and shoulders of US-27. Motorists should be alert for construction vehicles entering and exiting the activity area. Motorists should pay close attention to the detour signage posted. The speed limit on US-27 in the construction zone remains 45 MPH. Weather permitting, the contractor may implement temporary lane/shoulder closures on weeknights between the hours of 7 PM and 6 AM. At least one lane will remain open in each direction on US-27. On Thursday, 11/12/20 thru Wednesday, 11/18/20, from 7 PM to 6 AM, temporary lane closures will be in place for southbound and northbound US-27 from the Olgiati Bridge to I-24 for grinding and grooving of the bridges and installing bridge joints. On Thursday night, 11/12/20 from 7 PM to 10 PM, temporary ramp closure will be in place for Martin Luther King Blvd on ramp to US-27 northbound for repairing the High Mast Light. Eastbound Martin Luther King Blvd. traffic to northbound US-27 will be detoured to Broad Street / 4th Street / Northbound US-27 Ramp. Westbound Martin Luther King Blvd. traffic to northbound US-27 will be detoured to Gateway Ave. / 6th Street / Chestnut Street / 4th Street / Northbound US27. On Friday night, 11/13/20, from 7 PM thru Monday morning, 11/16/20, until 6 AM, a temporary road closure will be in place on Manufacturers Road (under US-27) between the northbound off ramp to the southbound on ramp for painting of the bridge’s structural steel over the road. During this time the westbound Manufacturers Road traffic will be detoured north onto US-27 / Signal Mountain Blvd. / left on Signal Mountain Blvd. / right onto Dayton Blvd. / US-27 southbound on ramp / US-27 southbound / southbound Manufacturers Road ramp. Eastbound Manufacturers Road traffic will be detoured south onto US-27 / East Martin Luther King Blvd. / US-27 northbound on ramp / US-27 northbound / northbound Manufacturers Road off ramp. Additionally, on Friday night 11/13/20, at 7 PM thru Saturday morning 11/14/20, until 8 AM, temporary lane and ramp closures will be in place for northbound US-27 from I-24 to Main Street for building and setting OH Sign Trusses. During this time the I-24 eastbound ramp to US-27 northbound will be closed. Traffic will be detoured to the Broad Street Exit then onto the US-27 northbound ramp from Broad Street. On Saturday 11/14/20, from 7 AM to 6 PM, temporary lane closures will be in place for southbound US-27 from the Olgiati Bridge to I-24 for sealing the ground asphalt. On Saturday night 11/14/20, at 5 PM thru Sunday morning 11/15/20, until 6 AM temporary lane and ramp closures will be in place for northbound US-27 from I-24 to Main Street for building and setting OH Sign Trusses. During this time the northbound ramp to 4th Street will be closed. Traffic will be detoured using northbound Martin Luther King Blvd. Exit / Eastbound Martin Luther King Blvd. / Broad Street / 4th Street. On Monday night, 11/16/20 thru Wednesday, 11/18/20 between the hours of 7 PM and 6 AM temporary lane closures will be in place for southbound US-27 from the Olgiati Bridge to I-24 for working on the Thermo Marking. State Trooper Requests: Yes – Friday and Saturday Night for the OH Sign Work Yes – Saturday during the day for the sealing Yes – Monday thru Wednesday Night for Thermo RESTRICTIONS: I-124 (US-27) Northbound Exit 1C 4th Street Off Ramp No oversize/over dimensional loads. I-124 (US-27) Southbound Exit 1A – 1B Martin Luther King Blvd Off Ramp No oversize/over dimensional loads I-124 (US-27) Southbound on Ramps from Martin Luther King Blvd No oversize/over dimensional loads
[Dement Construction Company, LLC/Micka/CNP230]
HAMILTON COUNTY TDOT Maintenance on SR-58 (HWY. 58) both directions from LM 17 to LM 21: During this reporting period, there will be intermittent lane closures on SR58 from LM 17 to LM21. Expect possible long delays as Maintenance crews are flagging traffic thru the work zone.
HAMILTON COUNTY Utility Work on SR-17 (GLASS ST.) both directions at LM 5.87: Shoulder and single lane closure between Latta Street and Daisy Street. Signage, cones, and flaggers will be present. Motorists should use caution through the area and be aware of personnel and equipment between 9 AM and 3 PM from 10/29/20 through 11/30/20.
HAMILTON COUNTY Utility Work on SR-8 (RIDGEWAY AVE.) both directions from LM 17.90 to LM 17.91: Shoulder and single lane closure between Rolling Way and Barrington Road. Signage, cones, and flaggers will be present. Motorists should use caution through the area and be aware of personnel and equipment between 9 AM and 3 PM from 10/26/20 through 11/30/20.
HAMILTON COUNTY Utility Work on SR-8 (SIGNAL MOUNTAIN RD.) both directions at LM 13.47: Lane closures between Mountain Creek Road and Mundy St. Motorists should reduce speed and be aware of new traffic pattern. Message boards and barrels will be present. Work will be from 9 AM to 3 PM daily, 10/19/20 to 11/30/20.
HAMILTON COUNTY SR-29 (US-27) repair of the bridge over Big Soddy Creek (LM 20.6): The contractor will be performing bridge & roadway repair on the SR-29 bridge over Big Soddy Creek. During this report period the contractor will have traffic restricted with two lanes of SR-111 southbound closed. Also, during this report period, the contractor will have two lanes of SR-29 north-bound closed. At least one lane of traffic in both directions shall always remain open.
[Mid-State Construction Company, Inc./Osbonlighter/CNU046]
HAMILTON COUNTY SR-2 (US-64, US-11) improvement of the intersection at Edgmon Road in Collegedale (LM 22.7), including grading, drainage and paving: During this report period, the contractor will be performing grading, drainage and paving. Extra care should be taken while trucks and heavy equipment are entering and exiting the roadway. The roadway may be temporarily restricted to a one lane roadway by flagging operation.
[Talley Construction Company, Inc./Osbonlighter/CNU012]
HAMILTON COUNTY SR-317 (Apison Pike) improvement project from SR-321 (Ooltewah-Ringgold Road) to east of Layton Lane: Lane closures and flagging operations will be required on SR-317, Apison Pike, to install power poles and transfer lines. The flagging operations will be performed on 11/12/20, 11/16/2020, 11/17/2020, 11/18/2020 from 7 AM to 1 PM and 3 PM to 7 PM. Closures will last about 2 hours per location. There will also be very short lane closures for blasting that will last five minutes or less. The contractor will have intermittent flagging operations during daytime non-peak hours for utility work, delivery of materials and equipment.
[Wright Brothers Construction Company, Inc./Osbonlighter/CNT336]
HAMILTON COUNTY SR-58 (Ochs Hwy.) resurfacing from the Georgia State line (LM 0) to SR-17 (LM 2.2): There will be a flagging operation to support a friction coating operation on the travel lanes along this mountain highway. Work will happen M -F (9AM – 4PM). There will be significant delays to the travelling public & alternate routes should be chosen if possible.
[Talley Construction Company, Inc./Micka/CNT146]
HAMILTON COUNTY The construction of an S.I.A. to VW: The contractor will be grading, paving, constructing retaining wall(s) and installing signals & lighting on S.I.A. route connecting Ferdinand Piech Way & Volkswagen Dr. The roadway is not open to traffic. The traveling public should be alert to the entrance and exit of construction vehicles from the jobsite onto the connecting roadways.
[Talley Construction Company, Inc./Osbonlighter/CNU221]