DISTRICT 29
HAMILTON COUNTY I-24 Replacement of Belvoir Ave. bridge over I-24 and I-24 bridges over Germantown Road near MM 183: Lane shifts are in place on I-24 EB and WB under the Belvoir Avenue Bridge, at North and South Terrace approaching the Belvoir Avenue Bridge, and on Germantown Road under the I-24 Bridge. Double interior lane closures will occur on I-24 EB between MM 182 and 184 to support demolition of the Belvoir Avenue Bridge on 06/25/20 and between 06/28/20 through 07/01/20 from 9 PM and 6 AM. Single lane closures and traffic pacing will be required on I-24 WB during these lane closures. Additionally, there will be single lane closures in the north and south directions of Germantown Road under the I-24 Bridge and at the intersections with North and South Terrace. These closures will occur on 06/25/20 and between 06/28/20 through 07/01/20 from 9 PM and 6 AM. Motorists should be aware of the Belvoir Avenue Bridge closure and detour that was put into place on 04/20/20. There is a 45 MPH speed limit reduction throughout the project corridor on I-24. Estimated project completion date is August 2021.
[Bell and Associates Construction, LP/Blevins/CMGC03]
HAMILTON COUNTY I-75 at I-24 Interchange Reconstruction: Watch for trucks entering and exiting project.Traffic should expect multiple lane shifts traveling through the interchange. Lane closures will occur Sunday nights through Thursday nights between 9 PM and 6 AM at the following locations: I-75 NB MM 1, I-75 SB MM 3 and I-24 EB MM 184.0 Traffic pacing may occur throughout interchange Sunday nights through Thursday nights between 9 PM and 6 AM. Additionally, there may intermittent shoulder closures at various locations for access to the median and roadside areas. The speed limit has been reduced to 45 MPH throughout the interchange.
[C.W. Matthews Contracting Company, Inc./Blevins/DB1801]
HAMILTON COUNTY US-27 (I-124) Widening from I-24/US-27 interchange to north of the Olgiati Bridge over the Tennessee River, including widening the Olgiati Bridge: Work on this project continues with activities occurring in the median of US-27. Motorists should be alert for construction vehicles entering and exiting the activity area. Additionally, the southbound ramp from W. Main St. to southbound US-27 has been temporarily closed and will remain so until further notice. Detours are posted. Motorists should pay close attention to the detour signage posted. The speed limit on US-27 in the construction zone remains 45 MPH. Weather permitting; the contractor may implement temporary lane/shoulder closures on weeknights between the hours of 7 PM and 6 AM. At least one lane will remain open in each direction on US-27. RESTRICTIONS: I-124 (US-27)Northbound Exit 1C 4th St. Off Ramp: No oversize/over dimensional loads; I-124 (US-27)Southbound Exit 1C 4th St Of Ramp: No oversize/over dimensional loads; I-124 (US-27) Southbound Exit 1-B Martin Luther King Blvd. Off Ramp: No oversized/over dimensional loads; Martin Luther King Blvd. between Chestnut St. and Gateway Ave.: No oversized/over dimensional loads.
[Dement Construction Company, LLC/Micka/CNP230]
HAMILTON COUNTY TDOT Bridge Maintenance on SR-29 (US-27) northbound at LM 11.4: Region 2 Bridge Maintenance will be performing maintenance on the bridge on the SR-29 northbound lane over SR-153 at LM 11.4on 06/30/20, from 9 AM – 4 PM. One lane will be closed during this time.
HAMILTON COUNTY TDOT Maintenance on SR-111 (STATE HWY. 111) northbound at LM 1.7: During this reporting period, traffic will be reduced to one lane of traffic in the Northbound direction.
HAMILTON COUNTY Utility Work on SR-17 (GLASS ST.) in both directions from LM 6.2 to LM 6.2:A portable traffic signal is in place at the intersection of Glass St. and Frost St with a single lane closure. Signage and cones will be present. The traffic signal will be operational between 9 am to 3 pm, changing to flashing yellow after hours. Motorists should use caution through the area. Estimated completion 07/01/20.
HAMILTON COUNTY Utility Work on SR-27 (MARKET ST.) southbound from LM 4.54 to LM 4.54:A sidewalk and lane closure will occur between W. 14th Street and Station Street along Market Street. Signage and barricades will be present. Pedestrians should be aware of the sidewalk detour. Motorists should use caution through the area and be aware of personnel and equipment between 8:30 AM and 5 PM from 05/18/20 through 07/01/20.
HAMILTON COUNTY Utility Work on SR-29 (US-27) both directions from LM .3 to LM 2: Between 06/29/20 and 07/01/20, EPB will have the outside lane closed from 9 AM – 3 PM as they work to perform normal maintenance work on their streetlights on SR-29.
HAMILTON COUNTY Utility Work on SR-8 (TAFT HWY.) southbound from LM 19.08 to LM 19.08:A shoulder and single lane closure will occur between Miles Road and James Blvd. Signage, cones, and flaggers will be present. Motorists should use caution through the area and be aware of personnel and equipment between 9 AM and 3 PM on 06/29/20.
HAMILTON COUNTY Utility Work on SR-8 (W. MAIN ST.) eastbound from LM 8.26 to LM 7.3:Mobile lane closures will occur along W. Main Street from Cowart Street to Central Avenue as crews transition work zone. Motorists should use caution and be aware of personnel and equipment when traveling through the work zones. Signage, cones, and flaggers will be present between 9 AM to 2 PM from 05/28/20 through 08/01/20.
HAMILTON COUNTY SR-29 (US-27) repair of the bridge over Big Soddy Creek (LM 20.6): During this report period the contractor will have traffic restricted with one lane of SR-29 south-bound closed over Big Soddy Creek. Additionally, one lane of SR-111 south-bound will be closed as it approaches the SR-29 junction. Estimated project completion date is May 2021.
[Mid-State Construction Company, Inc./Osbonlighter/CNU046]
HAMILTON COUNTY SR-317 (Apison Pike) Improvement project from SR-321 (Ooltewah-Ringgold Road) to east of Layton Lane: Tallant Rd. will be closed on 06/26/20 beginning at 6 PM. The contractor will work around the clock until work is completed. The closure is required for an open cut of the roadway to install sanitary sewer. The road is expected to be open by end of day on 06/27/20 excluding unforeseen construction delays. Random flagging will occur to allow for equipment and materials delivery. Estimated project completion date is June 2025.
[Wright Brothers Construction Company, Inc./Osbonlighter/CNT336]
HAMILTON COUNTY SR-58 Resurfacing from the Georgia State line (LM 0) to SR-17 (LM 2.2): The final stage (friction coat application) of this project has been rescheduled for mid-August. Estimated project completion date is November 2019.
[Talley Construction Company, Inc./Micka/CNT146]
HAMILTON COUNTY SR-8 (US-127/SIGNAL MOUNTAIN BLVD.) in both directions from the Space House to bottom of mountain: Due to the road being washed out, traffic has been reduced to one lane in each direction at this location.
[GeoStabilization International, LLC /Maintenance/MAINT]