HAMILTON COUNTY I-24 Utility Work both directions at MM 181: NIGHTTIME (8 pm – 5:30 am) and DAYTIME (8 am – 5:30 pm) shoulder and lane closure on 4th Avenue at the on and off ramps to 1-24. Motorists should reduce speed and be prepared to stop. Trucks, signage, and barrels/cones will be present, 01/23/24 through 06/30/24. [2023-192/197] |
HAMILTON COUNTY I-24 concrete repair from east of the I-124 (US-27) ramps (MM 179.0) to east of Long Street (MM 178.8): During this reporting period from 9 PM-6 AM, there will be nightly lane closures on I24 and the I24 WB off ramp to US27 NB. During these closures, there is the possibility that ramps might be temporarily closed. During the weekdays from 9 PM-6 AM, there will be 1 lane closed on I24 EB and WB. Also, during this time, US27 SB Traffic onto I24 EB ramp traffic will be detoured onto the Broad St. ramp. The traffic will use the new Frontage Road and get back onto I24 EB at the Market St. on-ramp to I24 EB. Traffic should expect possible long delays during this time and to find alternate routes around this area. |
HAMILTON COUNTY I-75 at I-24 Interchange Reconstruction Phase 2: Nightly lane closures will occur on this project, 9 PM to 6 AM, on I-75 North and South between Exit 1 (East Ridge) and Exit 3A (East Brainerd Road/ SR-320) and on I-24 East and West from Germantown Road to Spring Creek Road, MM182 to MM185, for various construction activities. Uniformed police officers will be present in these work zones to assist with traffic management and to enforce traffic laws. It may also be necessary to do short duration (15 to 30 minutes) rolling roadblocks during the day for patching potholes, clearing debris or to repair guardrail, attenuators, etc. The left lane on North and South Terrace between Belvoir Avenue and Spring Creek Road will be closed for installation of drainage structures, retaining and noise wall construction. Intermittent daytime non-rush hour lane closures may also be necessary throughout the period on South Terrace and North Terrace to work on utilities, street lighting, and various other construction items. All work is weather permitting. Moore Road and McBrien Road bridges over I 24 are closed as well as the entrance and exit ramps to I-24 between Belvoir Avenue and Moore Road. A continuous flow detour using Belvoir Avenue and Spring Creek Road is in place for local traffic. The closures and detour will be in place for approximately 6 months. RESTRICTIONS: Moore Road and McBrien Road over I-24 closed. I-24 Ramps between Belvoir and Moore Road closed. RESTRICTIONS: Moore Road and McBrien Road over I-24 closed. I-24 Ramps between Belvoir and Moore Road closed. |
HAMILTON COUNTY SR-17 (S. WILLOW ST.) Utility Work northbound at LM 2.8: Shoulder and lane closures on SR-17 (S. Willow Street) between Bennett Avenue and E. 12th Street. Motorists should reduce speed and be prepared to stop. Trucks, signage and barrels/cones will be present, 05/30/24 through 05/31/24 from 9 am to 3 pm. [2024-354] |
HAMILTON COUNTY SR-2 (E. 23RD ST.) Utility Work both directions from LM 9.69 to LM 9.94: NIGHTTIME (8 pm – 5:30 am) shoulder and lane closure on SR-2 (E. 23rd Street) between 4th Avenue and Dodds Avenue. Motorists should reduce speed and be prepared to stop. Trucks, signage, and barrels/cones will be present, 01/23/24 through 06/30/24. [2023-192/197] |
HAMILTON COUNTY SR-2 (LEE HWY.) Utility Work westbound at LM 15.9: Shoulder and lane closures on SR-2 (Lee Hwy) between Jim Snow Way/Provence Street and Chickamauga Road. Motorists should reduce speed and be prepared to stop. Trucks, signage and barrels/cones will be present, 06/03/24 through 06/05/24 from 9 am to 2 pm. [2024-348] |
HAMILTON COUNTY SR-2 (MCCALLIE AVE.) TDOT Maintenance both directions from LM 11.63 to LM 11.83: McCallie Tunnels will be closed for sidewalk railing repair from 9pm 05/29/24 to 6am 05/30/24. Detours will be provided. |
HAMILTON COUNTY SR-312 (BIRCHWOOD PK.) Utility Work both directions from LM 0.64 to LM 1.2: Shoulder and lane closures on SR-312 (Birchwood Pike) between SR-60 and Sam Smith Road. Motorists should reduce speed and be prepared to stop. Trucks, signage, flaggers, and barrels/cones will be present, 05/28/24 from 9 am – 12 pm, with a rain date of 05/30/24. [2024-333] |
HAMILTON COUNTY SR-317 (BONNY OAKS DR.) Utility Work both directions from LM 1.168 to LM 1.109: Shoulder and lane closures on SR-317 (Bonny Oaks Drive) between Pilot Point and Powers Court. Motorists should reduce speed and be prepared to stop. Trucks, signage and barrels/cones will be present, 05/30/24 through 06/03/24 from 9 am to 2 pm. [2024-351] |
HAMILTON COUNTY SR-60 (STATE HWY. 60) Utility Work eastbound from LM 24.93 to LM 24.13: Shoulder closure on SR-60 between Ooltewah Georgetown Rd/Old State Hwy 58 and 7820 Georgetown Rd NW (C.A.R.E. Automotive). Motorists should reduce speed and be prepared to stop. Trucks, signage and barrels/cones will be present, 06/04/24 through 06/06/24 from 9 am to 12 pm. [2024-336] |
HAMILTON COUNTY SR-8 (CHEROKEE BLVD.) TDOT Maintenance northbound from LM 11.14 to LM 11.21: Stringers Ridge Tunnel will be closed for sidewalk railing repair from 9pm 05/30/24 to 6am 05/31/24. Detours will be in place. |
HAMILTON COUNTY SR-8 (RIDGEWAY AVE.) Utility Work both directions from LM 17.73 to LM 17.86: Intermittent stoppages as well as shoulder and lane closures on SR-8 (Ridgeway Avenue) between Key Street and Barrington Road. Motorists should reduce speed and be prepared to stop. Trucks, flaggers, signage and barrels/cones will be present, 05/28/24 from 9 am to 2 pm, with a rain date of 05/29/24. [2024-332] |
HAMILTON COUNTY I-124 (US-27) from I-24 Interchange to South of the Tennessee River Bridge: During this reporting period, daily lane closures are possible between 9 AM and 3:30 PM as the contractor begins this work. Lane closures can be on West 4th St., Off Ramp ‘M’ & ‘N’ On Ramps ‘M’& ‘R’. Motorists are advised to reduce speed in the work zone and watch for flaggers assisting with traffic control. |
HAMILTON COUNTY I-75 at the Hamilton Place Mall interchange: The SR-153 southbound ramp to I-75 northbound has been reduced to one lane. I-75 northbound has been shifted to the outside reducing to 3 lanes from MM 4.6 to MM 6.0. |
HAMILTON COUNTY Resurfacing on SR-29 (US-27) from south of Old Dayton Pike (LM 25.7) to north of Coulterville Road (LM 28.3): The contractor plans to begin work this reporting period. Temporary lane closures on US-27 from Old Dayton Pike to Coulterville Road are planned Monday through Friday from 9 AM – 3 PM. |
HAMILTON COUNTY SR-111 construction of two small drainage structures at LM 1.7 and LM 2.4: On SR-111 Northbound and Southbound from LM 1.5-2.00, there will be intermittent temporary lane closures as the contractors finish final cleanup. The motoring public should use caution as the work will remain active until cleanup work is complete. |
HAMILTON COUNTY SR-29 (US-27) resurfacing from Morrison Springs Road (LM 6.1) to SR-153 (LM 11.6): During this reporting period from 7 PM-6 AM, the contractor will have temporary lane closures on US27 from Morrison Springs Road Exit ramps to past the SR-153 Ramps. During these closures, there will be the possibility of the contractor temporarily closing some of these ramps. Additionally, there are temporary daytime lane closures planned 5/29/2024 to 5/31/2024 from 9 AM – 3 PM. The motoring traffic is advised to drive carefully while this work is ongoing. |
HAMILTON COUNTY SR-317 (Apison Pike) improvement project from SR-321 (Ooltewah-Ringgold Road) to east of Layton Lane: Lane closures and flagging operations will be required on SR-317, Apison Pike, for utility and grading work. The flagging operations will be performed on 05/30/24, 05/31/24, 06/03/24, 06/04/24 and 06/05/24 from 7 AM to 1 PM and 3 PM to 7 PM. Closures will last about 2 hours per location. The contractor will have intermittent flagging operations during daytime non-peak hours for utility work, delivery of materials and equipment. |