HAMILTON COUNTY I-24 interchange improvement at SR-2 (US-11, US-41, US-72, Broad Street) and SR-58 (Market Street): Williams Street is closed to all traffic at the I-24 underpass to support the installation of new storm drainage structures for the new frontage road. Traffic will still have access to access the ramps to I-24 and US 27, but no through traffic will be allowed on Williams Street between West 21st Street and West 25th Street. Traffic will detour around the closure via West 21st Street and Broad Street. Signs are posted. The contractor will be working on new bridge construction, storm drainage structures, and utility relocation. The US 27 N on-ramp at William St. has been closed and it will remain closed until the new alignment for the ramp is completed. There will be marked detour signs to use the Broad St. US 27 on-ramp. The contractor has opened up the new Broad St exit off I-24 and closed the existing exit to the Broad St that is off the US 27 S exit. Traffic from US 27 S that needs to access Broad St. will use the Williams St. exit. Detour signs are posted. Drivers need to be aware of the changes. The US 27 South ramp onto I-24 East will be reduced to 2 lanes with the Williams St. exit still open. The ramp will be this way for several months and traffic is advised to drive with caution in this area. The contractor has opened up the new ramp off the US 27 S ramp to Broad St. The Williams St. Ramp that was coming off US 27 S has been permanently closed. Starting on Sunday night at 9 PM, the contractor will be closing a lane on the US 27 S ramp onto I-24 East. The contractor will close the right lane and this lane will be closed starting Sunday night through Friday. The motoring public needs to be aware of this lane closure and expect delays getting onto I-24 East.
[Wright Brothers Construction Company, Inc./Curtis/CNU011]
HAMILTON COUNTY I-75 concrete repair from MM 6.6 to MM 12.8: During this reporting period from 9 PM-6 AM, the contractor will have lane closures on I-75 North from MM 6.6 – 12.6. Traffic should expect possible delays while this work is performed. Also, the contractor might have to temporarily close an exit ramp so that they can place the pavement markings on the ramps and gore areas.
[Summers-Taylor, Inc./Curtis/CNW046]
HAMILTON COUNTY SR-17 (CAMPBELL ST.) Utility Work both directions from LM 6.5 to LM 7: Shoulder and single lane closures from Wilder Street to Grove Street. Motorists should reduce speed and use caution while traveling through the work zone and be aware of construction personnel. Trucks, signage, cones, and flaggers will be present, 04/17/23 through 04/21/23 from 9 am – 2 pm. [2023-027]
HAMILTON COUNTY SR-2 (LEE HWY.) Utility Work southbound at LM 18.04: Shoulder and single lane closures from Shallowford Road to Hickory Valley Road. Motorists should reduce speed and use caution while traveling through the work zone and be aware of construction personnel. Trucks, signage, cones/barrels, and flaggers will be present, 04/24/23 through 04/26/23 from 9 am – 2 pm. [2023-100]
HAMILTON COUNTY SR-317 (Apison Pike) improvement project from SR-321 (Ooltewah-Ringgold Road) to east of Layton Lane: Lane closures and flagging operations will be required on SR-317, Apison Pike, for utility and grading work. The flagging operations will be performed on 04/20/23, 04/21/23, 04/24/23, 04/25/23 and 04/26/23 from 7 AM to 1 PM and 3 PM to 7 PM. Closures will last about 2 hours per location. The contractor will have intermittent flagging operations during daytime non-peak hours for utility work, delivery of materials and equipment. There will also be flagging operations along Spalding Dr for the construction of Bridge 1.
[Wright Brothers Construction Company, Inc./Osbonlighter/CNT336]
HAMILTON COUNTY SR-321 (OOLTEWAH-RINGGOLD RD.) Utility Work northbound from LM 0.59 to LM 0.91: Intermittent lane closures on Ooltewah Ringgold Rd between Cobble Creek Way (Stonebrook Community) and East Brainerd Rd. Motorists should reduce speed and use caution through the work zone. Arrows boards, signage, drums, and flaggers will be present between 9 am – 2 pm, 04/10/23 through 05/12/23. [2023-156]
HAMILTON COUNTY SR-8 (E. MAIN ST.) Utility Work eastbound from LM 5.94 to LM 6.42: Shoulder and single lane closures from S. Orchard Knob Ave and S. Watkins Street. Motorists should reduce speed and be prepared to stop. Trucks, signage, and barrels will be present, 12/01/22 through 04/30/23 from 9 am – 2 pm. [2022-754]
HAMILTON COUNTY SR-8 (US-127) construction near Palisades Road (LM 15.2) to near Sunset Drive (LM 15.4): The contractor has closed the right lane going up the Signal Mountain Road from LM 15 (about 1/2 Mi from Palisades Road) to past Sunset Drive. This closure will be in effect for several months during the duration of this project. There will be intermittent lane closures on Signal Mountain Road as the contractor will have flaggers out as they work. Due to the possibility of flaggers stopping traffic, traffic should be aware of possible delays in this area.
[Wright Brothers Construction Company, Inc./Curtis/CNW001]
HAMILTON COUNTY SR-8 (US-41, US-76) Bachman Tubes cleaning: On Thursday Night of this reporting period, the contractor will be shutting down the tunnels from 8 PM-6 AM to clean it. There will be a signed detour for traffic to follow to get around the closure.
[Diamond Specialized, Inc./Curtis/CNW197]