HAMILTON COUNTY I-24 interchange improvement at SR-2 (US-11, US-41, US-72, Broad Street) and SR-58 (Market Street): Williams Street is closed to all traffic at the I-24 underpass to support the installation of new storm drainage structures for the new frontage road. Traffic will still be able to access the ramps to I-24 and US-27, but no through traffic will be allowed on Williams Street between West 21st Street and West 25th Street. Traffic will detour around the closure via West 21st Street and Broad Street. Signs will be posted. The contractor is working on new bridge construction, storm drainage structures, and utility relocation. The US-27 N on-ramp at William St. has been closed and will remain closed until the new alignment for this ramp is completed. There will be marked detour signs to use the Broad St. US-27 on-ramp. The contractor has opened up the new Broad St exit off I-24 and closed the existing exit to Broad St off US27. The US 27 South ramp onto I-24 East will be reduced to 2 lanes with the Williams St. exit still open. This ramp will be this way for several months and traffic is advised to drive with caution in this area. The contractor has opened up the new ramp off the US27 S ramp to Broad St. The Williams St. Ramp that was coming off US 27 S has been permanently closed. Next week, the contractor will close the shoulder on the US27 S ramp onto I24 E so that they can work to backfill the overhead sign footer.
[Wright Brothers Construction Company, Inc./Curtis/CNU011]
HAMILTON COUNTY I-75 at I-24 Interchange Reconstruction Phase 2: Weather permitting, the contractor will implement single lane closures between the hours of 9 PM until 6 AM Sunday through Thursday, at following locations: I-24 WB MM 185 to MM 183 and North Terrace, I-75 NB MM 2 to MM 4, I-75 SB MM 4 to MM 2.
[Wright Brothers Construction Company, Inc./Maj Prj – Blevins/DB2101]
HAMILTON COUNTY I-75 concrete repair from MM 6.6 to MM 12.8: During this reporting period from 9 PM-6 AM, the contractor will have lane closures on I75 Northbound from MM6.6-12.6. Traffic should expect possible delays and traffic needs to be cautious while this work is going on.
[Summers-Taylor, Inc./Curtis/CNW046]
HAMILTON COUNTY SR-17 (CAMPBELL ST.) Utility Work both directions from LM 6.5 to LM 7: Shoulder and single lane closures from Wilder Street to Grove Street. Motorists should reduce speed and use caution while traveling through the work zone and be aware of construction personnel. Trucks, signage, cones, and flaggers will be present, 04/17/23 through 04/21/23 from 9 am – 2 pm. [2023-027]
HAMILTON COUNTY SR-2 (LEE HWY.) Utility Work southbound at LM 18.57: Shoulder and single lane closures between McCutcheon Road and Shallowford Road. Motorists should reduce speed and use caution while traveling through the work zone and be aware of construction personnel. Trucks, signage, cones/barrels, and flaggers will be present, 04/17/23 through 04/19/23 from 9 am – 2 pm. [2023-099]
HAMILTON COUNTY SR-2 (US-11, US-64) McCallie Tunnel cleaning: The contractor will be cleaning this tunnel on Wednesday from 8 PM-6 AM. As this work is being done, there will be one lane closed in each direction.
[Diamond Specialized, Inc./Curtis/CNW197]
HAMILTON COUNTY SR-317 (Apison Pike) improvement project from SR-321 (Ooltewah-Ringgold Road) to east of Layton Lane: Lane closures and flagging operations will be required on SR-317, Apison Pike, for utility and grading work. The flagging operations will be performed on 04/13/23, 04/14/23, 04/17/23, 04/18/23 and 04/19/23 from 7 AM to 1 PM and 3 PM to 7 PM. Closures will last about 2 hours per location. The contractor will have intermittent flagging operations during daytime non-peak hours for utility work, delivery of materials and equipment. There will also be flagging operations along Spalding Dr for the construction of Bridge 1.
[Wright Brothers Construction Company, Inc./Osbonlighter/CNT336]
HAMILTON COUNTY SR-321 (OOLTEWAH-RINGGOLD RD.) Utility Work northbound from LM 0.59 to LM 0.91: Intermittent lane closures on Ooltewah Ringgold Rd between Cobble Creek Way (Stonebrook Community) and East Brainerd Rd. Motorists should reduce speed and use caution through the work zone. Arrows boards, signage, drums and flaggers will be present between 9 am – 2 pm, 04/10/23 through 05/12/23. [2023-156]
HAMILTON COUNTY SR-8 (E. MAIN ST.) Utility Work eastbound from LM 5.94 to LM 6.42: Shoulder and single lane closures from S. Orchard Knob Ave and S. Watkins Street. Motorists should reduce speed and be prepared to stop. Trucks, signage, and barrels will be present, 12/01/22 through 04/30/23 from 9 am – 2 pm. [2022-754]
HAMILTON COUNTY SR-8 (US-127) construction near Palisades Road (LM 15.2) to near Sunset Drive (LM 15.4): The contractor has closed the right lane going up the Signal Mountain Road from LM 15 (about 1/2 Mi from Palisades Road) to past Sunset Drive. This closure will be in effect for several months during the duration of this project. There will be intermittent lane closures on Signal Mountain Road as the contractor will have flaggers out as they work. Due to the possibility of flaggers stopping traffic, traffic should be aware of possible delays in this area.
[Wright Brothers Construction Company, Inc./Curtis/CNW001]
HAMILTON COUNTY SR-8 (US-127) Stringers Ridge Tunnel cleaning: On Wednesday of this reporting period from 8 PM-6 AM, the tunnel will be closed as the contractor washes the tunnel. There will be signs directing traffic to go for the detour around the closure.