HAMILTON COUNTY I-24 interchange improvement at SR-2 (US-11, US-41, US-72, Broad Street) and SR-58 (Market Street): Williams Street is closed to all traffic at the I-24 underpass to support the installation of new storm drainage structures for the new frontage road. Traffic will still be able to access the ramps to I-24 and US-27, but no through traffic will be allowed on Williams Street between West 21st Street and West 25th Street. Traffic will detour around the closure via West 21st Street and Broad Street. Signs will be posted. The contractor will be working on new bridge construction, storm drainage structures, and utility relocation. Chestnut Street is closed at the I-24 underpass and will remain closed until the construction of bridge #2 is complete. Detour routes are posted. The US-27 N on-ramp at William St. has been closed and it will remain closed until the new alignment for this ramp is completed. There will be marked detour signs to use the Broad St. US-27 on-ramp. The contractor has opened up the new Broad St exit off I-24 and closed the existing Exit to the Broad St. that is off the US27 S exit. Traffic from US27 S that needs to get to Broad St. will have to use the Williams St. exit. There will be detour signs to direct traffic off the Williams St. exit to Broad St. Also, with the end of the new exit ramp there will be a new traffic signal at the intersection of the new exit and Broad St. With the new traffic pattern, the drivers need to be aware of the changes. On Thursday night of this reporting period from 9:00 PM – 6:00 AM, the contractor will be closing the right lane on I-24 E from MM177.6 to MM178.3. Also, while the contractor has this lane closed, they will perform rolling roadblocks on I-24 East from MM175 to MM178.3 so that the contractor can install the overhead signs on I-24 for this project.
[Wright Brothers Construction Company, Inc./Curtis/CNU011]
HAMILTON COUNTY I-75 at I-24 Interchange Reconstruction Phase 2: Single lane closures will at the following locations from 11/20/22 to 11/23/22 between 9:00 PM and 6:00 AM: I-24 W MM184.5, I-24 E 184, and South Moore Road between North Terrace and South Terrace.
[TDOT/Maj Prj – Blevins/DB2101]
HAMILTON COUNTY I-75 concrete repair from MM 6.6 to MM 12.8: During this reporting period, the contractor will be having lane closures in both the Northbound and Southbound directions on I-75 from 9:00 PM – 6:00 AM. During these lane closures, the contractor might have to temporary close some of the ramps so that they can work on the ramp.
[Summers-Taylor, Inc./Curtis/CNW046]
HAMILTON COUNTY SR-153 resurfacing from LM 3.5 to LM 3.7, including bridge expansion joint repair on the railroad overpass bridge (LM 3.6); SR-2 resurfacing on (US-11, US-64) from the NB interstate ramps (LM 20.6) to the Bradley County line (LM 24.4): During this reporting period, the contractor will have intermittent lane closures on SR-153, LM 3.6 to perform a resurfacing operation. Drivers are encouraged to be aware of safety personnel and construction vehicles entering and exiting the jobsite.
[Wright Brothers Construction Company, Inc./Osbonlighter/CNW131]
HAMILTON COUNTY SR-17 (BONNY OAKS DR.) TDOT Bridge Inspection both directions from LM 8.15 to LM 8.25: On Monday, 11/21/22 from 8:30 AM to 4:00 PM, a flagging operation will occur on the bridge over South Chickamauga Creek in order to perform the biannual bridge inspection. Work will take place on Tuesday, 11/22/22 if it must be postponed.
HAMILTON COUNTY SR-17 resurfacing from the Georgia state line (LM 0) to SR-2 (US-11, US-64, US-72, LM 2.2): During this reporting period, there will be lane closures during the day as the contractor will be starting to mill the roadway. There will be flaggers stopping traffic as this work is being done. The motoring public needs to expect possible long delays as this work is going on.
[Talley Construction Company, Inc./Curtis/CNW213]
HAMILTON COUNTY SR-317 (Apison Pike) improvement project from SR-321 (Ooltewah-Ringgold Road) to east of Layton Lane: Lane closures and flagging operations will be required on SR-317, Apison Pike, for utility work. The flagging operations will be performed on 11/17/22, 11/18/22, 11/19/22, 11/21/22, 11/22/22, and 11/23/22 from 7 AM to 1 PM and 3 PM to 7 PM. Closures will last about 2 hours per location. The contractor will have intermittent flagging operations during daytime non-peak hours for utility work, delivery of materials and equipment. Traffic has been shifted onto the new alignment of SR-317 by the existing intersection of Apison Pike and University Drive and by Eastview Terrace.
[Wright Brothers Construction Company, Inc./Osbonlighter/CNT336]
HAMILTON COUNTY SR-319 (AMNICOLA HWY.) Utility Work both directions from LM 1.59 to LM 1.63: THP assisted one lane reduction in both directions with a brief all stop for aerial crossings along Amnicola Hwy between Chattanooga State entrance and DuPont Parkway. Motorists should be prepared to stop and be aware of personnel and equipment when traveling through the work zone. THP, trucks, and signage will be present, 11/20/22 from 7:00 AM to 9:00 AM, with a rain date of 12/04/22. [2022-600]
HAMILTON COUNTY SR-319 (AMNICOLA HWY.) Utility Work westbound at LM 1.42: Shoulder and single lane closures from the Railroad Bridge to Chattanooga State Campus Entrance. Motorists should reduce speed and be prepared to stop. Trucks, signage, and barrels will be present, 11/21/22 through 11/23/22 from 9:00 am – 2:00 pm. [2022-556]
HAMILTON COUNTY SR-8 (RIDGEWAY AVE.) Utility Work southbound at LM 17.01: Shoulder and single lane closures from Signal Road to Signal Mountain Blvd. Motorists should reduce speed and be prepared to stop. Trucks, signage, and barrels will be present, 11/17/22 through 11/23/22 from 9:00 am – 2:00 pm. [2022-665]
HAMILTON COUNTY SR-8 (US-127) construction near Palisades Road (LM 15.2) to near Sunset Drive (LM 15.4): The contractor has closed the right lane going up the Signal Mountain Road from LM 15 (about 1/2 Mi from Palisades Road) to past Sunset Drive. This closure will be in effect for several months during the duration of this project. Also, there will several intermittent lane closures daily on SR 8(Signal Mountain Road) as the contractor is working on SR 8 (Signal Mountain Road).
[Wright Brothers Construction Company, Inc./Curtis/CNW001]
HAMILTON COUNTY SR-8 (US-41, US-76) Bachman Tubes cleaning: On Thursday Night of this reporting period, the contractor will be shutting down the tunnels from 8:00 PM – 6:00 AM to clean it. There will be a signed detour for traffic to follow to get around the closure.
[Diamond Specialized, Inc./Curtis/CNW197]
HAMILTON COUNTY The construction of an S.I.A. to VW: The contractor will be performing resurfacing operations starting 10/20/2022 throughout the intersection connecting the S.I.A. route, Ferdinand Piech Way, & Volkswagen Dr. The new 4-way signalized intersection will continue to operatorial & traffic has been shifted to the new alignment. Traveling public should be cautious of the new traffic pattern and lane shifts in effect including a lowered speed limit. The traveling public should also be alert to the entrance and exit of construction vehicles & staff on and around the jobsite and the connecting roadways. Flaggers may be onsite directing traffic.
[Talley Construction Company, Inc./Osbonlighter/CNU221]