DISTRICT 29
HAMILTON COUNTY I-75 at I-24 Interchange Reconstruction: Phase 1 traffic shifts have been implemented. Traffic should expect multiple lane shifts traveling through the interchange. Lane closures will occur Sunday nights through Thursdays night between 9 PM and 6 AM at the following locations: I-75 NB at state line, I-75 NB MM 2, I-75 SB MM 3, I-24 EB MM 185, I-24 WB 185. Traffic pacing will also occur for I-75 NB, I-75 SB, and I-24 EB. Additionally, shoulders may be closed at various locations between 9 AM and 3 PM for access to the median and roadside areas. The speed limit has been reduced to 45 MPH throughout the interchange. On Spring Creek Road beginning on 12/15/19 through 12/19/19 there will be nighttime flagging operations.
[C.W. Matthews Contracting Company, Inc./Blevins/DB1801]
HAMILTON COUNTY US-27 (I-124) Widening from I-24/US-27 interchange to north of the Olgiati Bridge over the Tennessee River, including widening the Olgiati Bridge: Work on this project continues with activities occurring on the west side of southbound US-27. Motorists should be alert for construction vehicles entering and exiting the area along the access ramps for eastbound and westbound M. L. King Boulevard. The speed limit for the access ramp is 35 MPH. In addition, the southbound ramp from W. Main St.to southbound US-27 has been temporarily closed and will remain so until further notice. Detours are posted. Motorists should pay close attention to the detour signage posted. The speed limit on US-27 in the construction zone remains 45 MPH. Weather permitting; the contractor may implement temporary lane/shoulder closures on weeknights between the hours of 7 PM and 6 AM. At least one lane will remain open in each direction on US-27. On Monday 12/16/19, Tuesday 12/17/19 & Wednesday 12/18/19) from 7AM to 5PM, temporary right Lane closures will be in place for northbound and southbound US-27 across the Olgiati Bridge, for removing barrier rail. The temporary lane closure will be set out from 7AM to 3PM on the northbound side and from 9AM to 5PM on the southbound side. No ramps will be closed during this operation.
RESTRICTIONS: I-124 (US-27)Northbound Exit 1C 4th St Off Ramp: No oversize/over dimensional loads; I-124 (US-27)Southbound Exit 1C 4th St Of Ramp: On oversize/over dimensional loads; I-124 (US-27) Southbound Exit 1A-B Martin Luther King Blvd. Off Ramp: No oversized/over dimensional loads; I-124 (US-27) Southbound On Ramps from Martin Luther King Blvd.: No oversized/over dimensional loads.
HAMILTON COUNTY Utility Work on SR-2 (BRAINERD RD.) in both directions from LM 13.8 to LM 15.3: Arrow boards, signage and flaggers will be present on Brainerd Rd at the Eastgate Loop intersection (Krispy Kreme) for utility work. Both eastbound and westbound lanes will be affected. 9 AM to 2 PM from 12/16/19 through 12/17/19.
HAMILTON COUNTY Utility Work on SR-317 (BONNY OAKS DR.) in both directions from LM 1.18 to LM 1.18: Bonny Oaks will be reduced to one lane in each direction between Jersey Pike and Redland Drive. Arrow boards, barrels and signage will be present. Motorists should use caution through the area and be aware of personnel and equipment. Motorists should seek an alternate route if possible. 7 AM to 5 PM from 12/14/19 through 12/15/19 and 10 PM to 5 AM from 12/16/19 through 12/19/19.
HAMILTON COUNTY Utility Work on SR-319 (HIXSON PK.) northbound from LM 7.46 to LM 7.46: A single lane closure of the northbound lane will occur between Big Ridge Road and Cassandra Smith Road. Signage and cones will be present. Motorists should use caution through the area, be aware of personnel and equipment. From 9 AM to 2 PM on 12/17/19.
HAMILTON COUNTY Utility Work on SR-320 (E. BRAINERD RD.) in both directions from LM 1.97 to LM 2.82: Mobile lane closures along East Brainerd Road will occur as crews transition the work zone between North Concord Lane and North Joiner Lane. Signage and flaggers will be present. Motorists should use caution. 10 PM – 6 AM, from 12/16/19 through 12/19/19.
HAMILTON COUNTY SR-153 Resurfacing from north of Shallowford Road (LM 2.6) to north of SR-58 (LM 4.8), including bridge deck repair: There will be lane closures on Thursday night 12/12/2019 (8:30 PM -12:00 AM) on SB SR153 to support addressing punch list items. Estimated project completion date is December 2019.