HAMILTON COUNTY I-24 interchange improvement at SR-2 (US-11, US-41, US-72, Broad Street) and SR-58 (Market Street): During this reporting period the contractor will be working on new bridge construction, retaining wall construction, and the placement of new overhead signs. Brief, intermittent lane closures are possible on Market Street (SR-58) and Broad Street (SR-2) for utility and storm drainage work. Chestnut street is closed at the I-24 underpass and will remain closed until the construction of bridge #2 is complete. Detour routes are posted. Beginning Monday 11/15/21 through Friday 11/19/21 and Monday 11/22/21 through Wednesday 11/24/21 at 9:00 PM to 6:00 AM daily the contractor will close the left (#1) lane of I-24 Eastbound to support the construction of foundations for new overhead signs.
[Wright Brothers Construction Company, Inc./Wagner/CNU011]
HAMILTON COUNTY I-24 Replacement of Belvoir Ave. bridge over I-24 and I-24 bridges over Germantown Road near MM 183: Lane closures may occur Sunday nights through Thursday nights between 9:00 PM and 6:00 AM to finish roadway items along I-24 EB and WB. Additionally, shoulders closure may occur on North and South Terraces between Germantown and Belvoir. The speed limit will remain reduced to 45 MPH throughout the project limits until construction crews demobilize.
[Bell and Associates Construction, LP/Blevins/CMGC03]
HAMILTON COUNTY I-24 Utility Work both directions from MM 178 to MM 185: During this Reporting period, EPB will have 1 lane closed in either direction on I-24 as they work on the existing overhead lighting. They will be working from 9:00 PM – 6:00 AM.
HAMILTON COUNTY SR-17 (ST. ELMO AVE.) Utility Work both directions at LM 0.39: Shoulder and multi-lane closures both North and South bound directions between W. 54th Street and W. 55th Street. Motorists should reduce speed and be prepared to stop. Signage, cones, and flaggers will be present, 11/04/21 through 12/03/21 from 9 am – 2 pm. [2021-698]
HAMILTON COUNTY SR-317 (Apison Pike) improvement project from SR-321 (Ooltewah-Ringgold Road) to east of Layton Lane: Lane closures and flagging operations will be required on SR-317, Apison Pike, to install power poles and transfer lines. Flagging operations will also be required on Tucker Road for dump trucks hauling fill dirt. The flagging operations will be performed on 11/18/21, 11/19/21, 11/22/21, 11/23/21, and 11/24/21 from 7:00 AM to 1:00 PM and 3:00 PM to 7:00 PM. Closures will last about 2 hours per location. The contractor will have intermittent flagging operations during daytime non-peak hours for utility work, delivery of materials and equipment. The contractor is also planning to flag traffic on a single lane of Tallant Road to finish the final portion of the roundabout on 11/22/21 and 11/23/21. The contractor is also planning to close a portion of Tucker Road to allow for filling operations in the upcoming weeks.
[Wright Brothers Construction Company, Inc./Osbonlighter/CNT336]
HAMILTON COUNTY SR-319 (Amnicola Highway) bridge repair over SR-153: Contractor will be performing bridge repair operations on the Amnicola (SR-319) bridge over SR-153. During this project, SR-319 will have lane closures in place & SR-153 may have lane closures as well. During repair operations at least one lane of traffic shall remain open in all directions.
[Mid-State Construction Company, Inc./Osbonlighter/CNV053]
HAMILTON COUNTY SR-8 (US-41 / US-76) resurfacing from east of East 29th St to SR-2 (US-11 / US-64) and on SR-2 (US-11 / US-64) from SR-8 (US-41 / US-76) to near the Missionary Ridge Tunnel: During this reporting period, there will be intermittent lane closures on both routes. There is a new traffic pattern on SR2 (Dobbs Avenue) from East 23rd St to McCallie Avenue. The traveling motorists need to be aware of this change and take caution thru this area.
[Talley Construction Company, Inc./Curtis/CNV155]
HAMILTON COUNTY SR-8 (US-41, US-76) Bachman Tubes cleaning: On Thursday Night of this reporting period, the contractor will be closing the tunnels from 8:00 PM – 6:00 AM to clean it. There will be a signed detour for traffic to follow to get around the closure.
[Diamond Specialized, Inc./Curtis/CNV157]
HAMILTON COUNTY The construction of an S.I.A. to VW: The contractor will be grading and installing signals & lighting on S.I.A. route connecting Ferdinand Piech Way & Volkswagen Dr. Also, the connecting roundabout will be under construction. **The roadway is not open to traffic**. The traveling public should be alert to the entrance and exit of construction vehicles from the jobsite onto the connecting roadways. Flaggers may be onsite directing traffic. Traveling public should be cautious of new traffic pattern in effect.
[Talley Construction Company, Inc./Osbonlighter/CNU221]