DISTRICT 29
HAMILTON COUNTY SR-153 resurfacing from north of SR-58 (LM 4.8) to the Tennessee River Bridge (LM 6.5): On Saturday, 2/6/21 (8AM to 5PM) there will be traffic shifts and lane closures on ramps along SR-153 affecting the Amnicola Hwy. interchange and the ramps just north of the SR-58 bridge. No more than two ramps will be affected at any given time. All single lane ramps will have traffic shifted to the shoulders. Both two lane ramps will experience a lane closure. No ramps will be closed during this punchlist work. The traveling public should alert to this activity.
[Wright Brothers Construction Company, Inc./Micka/CNU196]
HAMILTON COUNTY SR-319 repair of the bridge over the Tennessee River and Riverpark Drive (LM 2.2): The contractor will be performing repair operations to the bridge that will require lane closures in both directions. Extra caution should be observed of trucks entering and exiting the work-zone. During this report period the contractor will have temporary lane closures in each direction. Additional flaggers will be present as needed.
[Mid-State Construction Company, Inc./Osbonlighter/CNU205]
HAMILTON COUNTY I-24 Replacement of Belvoir Ave. bridge over I-24 and I-24 bridges over Germantown Road near MM 183: Lane shifts and single lane closures are in place at North and South Terrace approaching the Belvoir Avenue Bridge. Single alternating lane closures on I-24 EB and WB will be used on 02/04/21, and 02/07/21 through 02/10/21 from 9 PM and 6 AM. Additionally, there will be single lane closures in the north and south directions of Germantown Road under the I-24 Bridge and at the intersections of Germantown with North and South Terrace. These closures will occur on 02/04/21 and 02/05/21, and between 01/08/21 and 02/10/21 from 9 AM to 6 AM the following morning. Motorists should be aware of the Belvoir Avenue Bridge closure and detour that was put into place on 04/20/20. There is a 45 MPH speed limit reduction throughout the project corridor on I-24.
[Bell and Associates Construction, LP/Blevins/CMGC03]
HAMILTON COUNTY I-75 at I-24 Interchange Reconstruction: Phase 2 traffic alignments have been implemented. Watch for trucks entering and exiting project. Traffic should expect multiple lane shifts traveling through the interchange. Lane closures will occur Sunday nights through Thursday nights between 9 PM and 6 AM at the following locations: I-75 NB MM 1, I-75 SB MM 3 and I-24 EB MM 184.0 Traffic pacing may occur throughout interchange Sunday nights through Thursday nights between 9 PM and 6 AM. Additionally, there may intermittent shoulder closures at various locations for access to the median and roadside areas. I-75 NB to I-24 WB split has been moved back 1500 feet from its previous location. Welcome Center traffic intending to use I-24 WB now, will have to detour on I-75 NB to Exit 3. Detailed detour information will be available at the Welcome Center. The speed limit has been reduced to 45 MPH throughout the interchange.
[C.W. Matthews Contracting Company, Inc./Blevins/DB1801]
HAMILTON COUNTY US-27 (I-124) widening from I-24/US-27 interchange to north of the Olgiati Bridge over the Tennessee River, including widening the Olgiati Bridge: Work on this project continues with activities occurring in the median and shoulders of US-27. Motorists should be alert for construction vehicles entering and exiting the activity area. Motorists should pay close attention to the detour signage posted. The speed limit on US-27 in the construction zone remains 45 MPH. Weather permitting, the contractor may implement temporary lane/shoulder closures on weeknights between the hours of 7 PM and 6 AM. At least one lane will remain open in each direction on US-27. Note: Monday thru Friday from 6 AM to 7 PM a minimum of two lanes will remain open both northbound and southbound on US-27. Monday thru Friday from 7 PM to 6 AM and Saturday and Sunday from 6 AM to 7 PM a minimum of one lane will remain open both northbound and southbound on US-27. Thursday 02/04/21 thru Wednesday 02/10/21, temporary lane closures will be in place for both southbound and northbound US-27 for striping and painting operations. Saturday 02/06/21 through Sunday 02/07/21 double right lane closures will be in place for both northbound and southbound directions to allow for striping operations from I-24 to the Olgiati Bridge. Thursday 02/04/21 thru Monday 02/08/21, Exit 1B northbound will be temporarily closed. Traffic will be detoured to Exit 1C northbound exit to 4th street, east to Broad Street, south to MLK Blvd. State Trooper requested for Saturday 02/06/21 and Sunday 02/07/21 for striping operations. RESTRICTIONS: I-124 (US-27) Northbound Exit 1C 4th Street Off Ramp No oversize/over dimensional loads. I-124 (US-27) Southbound Exit 1A – 1B Martin Luther King Blvd Off Ramp No oversize/over dimensional loads I-124 (US-27) Southbound on Ramps from Martin Luther King Blvd No oversize/over dimensional loads.
[Dement Construction Company, LLC/Micka/CNP230]
HAMILTON COUNTY Utility Work on SR-148 (LOOKOUT MTN. SCENIC HWY.) southbound at LM 0.10: Shoulder and single lane closure between Lula Lake Road and TN-GA State Line. There will be temporary red lights to assist with the closure, as well as signage and cones. Motorists should use caution through the area and be aware of personnel and equipment between 9 AM and 3 PM from 12/15/20 through 02/28/21. [2020-735]
HAMILTON COUNTY Utility Work on SR-2 (LEE HWY.) both directions at LM 17.12: Shoulder and single lane closure between Hwy 153 to Dupre Road. Signage and cones will be present. Motorists should use caution through the area and be aware of personnel and equipment between 9 AM and 2 PM starting 02/01/20 through 02/10/21. [2021-043]
HAMILTON COUNTY SR-29 (US-27) repair of the bridge over Big Soddy Creek (LM 20.6): The contractor will be performing bridge & roadway repair on the SR-29 bridge over Big Soddy Creek. During this report period the contractor will have traffic restricted with two lanes of SR-111 southbound closed. Also, during this report period, the contractor will have two lanes of SR-29 north-bound closed. At least one lane of traffic in both directions shall always remain open.
[Mid-State Construction Company, Inc./Osbonlighter/CNU046]
HAMILTON COUNTY SR-2 (US-64, US-11) improvement of the intersection at Edgmon Road in Collegedale (LM 22.7), including grading, drainage and paving: During this report period, the contractor will be performing grading, drainage and paving. Extra care should be taken while trucks and heavy equipment are entering and exiting the roadway. The roadway may be temporarily restricted to a one lane roadway by flagging operation.
[Talley Construction Company, Inc./Osbonlighter/CNU012]
HAMILTON COUNTY SR-317 (Apison Pike) improvement project from SR-321 (Ooltewah-Ringgold Road) to east of Layton Lane: Lane closures and flagging operations will be required on SR-317, Apison Pike, to install power poles and transfer lines. The flagging operations will be performed on 02/04/21, 02/08/2021, 02/09/2021, and 02/10/2021 from 7 AM to 1 PM and 3 PM to 7 PM. Closures will last about 2 hours per location. Eastview Terrace will also have short closures to connect driveways to the new roadway. There will also be very short lane closures for blasting that will last five minutes or less. The contractor will have intermittent flagging operations during daytime non-peak hours for utility work, delivery of materials and equipment.
[Wright Brothers Construction Company, Inc./Osbonlighter/CNT336]
HAMILTON COUNTY The construction of an S.I.A. to VW: The contractor will be grading, paving, constructing retaining wall(s) and installing signals & lighting on S.I.A. route connecting Ferdinand Piech Way & Volkswagen Dr. The roadway is not open to traffic. The traveling public should be alert to the entrance and exit of construction vehicles from the jobsite onto the connecting roadways. Flaggers will be onsite directing traffic.
[Talley Construction Company, Inc./Osbonlighter/CNU221]