HAMILTON COUNTY SR-153 resurfacing from north of SR-58 (LM 4.8) to the Tennessee River Bridge (LM 6.5):Weather permitting, construction will continue along SR-153 requiring nighttime NB & SB lane closures, Thursday thru Wednesday night (7 PM to 6 AM). One lane will always remain open in each direction during construction. On Monday 12/22/20, the contractor will be fog sealing the shoulders on SR-153 between 9AM – 3PM. This will be a mobile operation, but the outside lane will be temporarily closed during the curing process. There will signage warning drivers to stay off of this sealant until it is cured. Speed is variably controlled @ 45mph during construction & allowed to resume to 55mph during non-construction periods.
[Wright Brothers Construction Company, Inc./Micka/CNU196]
HAMILTON COUNTY SR-319 repair of the bridge over the Tennessee River and Riverpark Drive (LM 2.2): The contractor will be performing repair operations to the bridge that will require lane closures in both directions. Extra caution should be observed of trucks entering and exiting the work-zone. During this report period the outside shoulder and outside lane of each direction are closed. Traffic is shifted to the left in both directions. Additional flaggers will be present as needed.
[Mid-State Construction Company, Inc./Osbonlighter/CNU205]
HAMILTON COUNTY The tunnel cleaning of the McCallie Tunnel on US-11(US-64, SR-2), the Stringers Ridge Tunnel on US-127(SR-8), and the Bachman Tubes on US-41 (US-76, S.R.8): On Wed, 12/16/20 (8 PM to 6 AM), there will be a tunnel cleaning operation at the McCallie Tunnels. This will be supported by a flagging operation. Later that night, the Stringers Ridge Tunnel will be cleaned & supported by a signed detour. On Thursday, 12/17 (8 PM to 6 AM), the Bachman Tubes (East Ridge tunnels on Ringgold Rd.) will be cleaned using a signed detour to control traffic.
[Diamond Specialized, Inc./Micka/CNU182]
HAMILTON COUNTY I-24 Replacement of Belvoir Ave. bridge over I-24 and I-24 bridges over Germantown Road near MM 183:Lane shifts and single lane closures are in place at North and South Terrace approaching the Belvoir Avenue Bridge. Single alternating lane closures on I-24 EB and WB will be used on 12/17/2020, and 12/20/2020 through 12/22/20 from 9 PM and 6 AM. Additionally, there will be single lane closures in the north and south directions of Germantown Road under the I-24 Bridge and at the intersections of Germantown with North and South Terrace. These closures will occur on 12/117/20 and 12/18/2020, and between 12/21/20 and 12/23/20 from 9 AM to 6 AM the following morning and on 12/23. All lane closures will be restricted through the project from 12 PM on 12/23/20 through 6 AM on 01/04/21. Motorists should be aware of the Belvoir Avenue Bridge closure and detour that was put into place on 04/20/20. There is a 45 MPH speed limit reduction throughout the project corridor on I-24.
[Bell and Associates Construction, LP/Blevins/CMGC03]
HAMILTON COUNTY I-75 at I-24 Interchange Reconstruction: Phase 2 traffic alignments have been implemented. Watch for trucks entering and exiting project. Traffic should expect multiple lane shifts traveling through the interchange. Lane closures will occur Sunday nights through Thursday nights between 9 PM and 6 AM at the following locations: I-75 NB MM 1, I-75 SB MM 3 and I-24 EB MM 184.0 Traffic pacing may occur throughout interchange Sunday nights through Thursday nights between 9 PM and 6 AM. Additionally, there may intermittent shoulder closures at various locations for access to the median and roadside areas. I-75 NB to I-24 WB split has been moved back 1500 feet from its previous location. Welcome Center traffic intending to use I-24 WB now, will have to detour on I-75 NB to Exit 3. Detailed detour information will be available at the Welcome Center. The speed limit has been reduced to 45 MPH throughout the interchange. **Holiday Schedule: Beginning 12/20/2020 through 01/03/2020 traffic will not be impacted by lane closures.
[C.W. Matthews Contracting Company, Inc./Blevins/DB1801]
HAMILTON COUNTY US-27 (I-124) widening from I-24/US-27 interchange to north of the Olgiati Bridge over the Tennessee River, including widening the Olgiati Bridge: Work on this project continues with activities occurring in the median and shoulders of US-27. Motorists should be alert for construction vehicles entering and exiting the activity area. Motorists should pay close attention to the detour signage posted. The speed limit on US-27 in the construction zone remains 45 MPH. Weather permitting, the contractor may implement temporary lane/shoulder closures on weeknights between the hours of 7 PM and 6 AM. At least one lane will remain open in each direction on US-27. Note: Monday thru Friday from 6 AM to 7 PM a minimum of two lanes will remain open both Northbound and Southbound on US-27. Monday thru Friday from 7PM to 6AM and Saturday and Sunday from 6 AM to 7 PM a minimum of one lane will remain open both Northbound and Southbound on US-27. On Thursday 12/17/20 thru Wednesday 12/23/20 – 7 PM to 6 AM Temporary Lane Closures will be in place for Southbound and Northbound US-27 from the Olgiati Bridge to I-24 with intermittent Ramp Closures. Thursday 12/17/20 and Friday 12/18/20 – 7 PM to 6 AM Temporary Ramp Closure will be in place for Exit A1 – US-27 Northbound to Carter Street for removing and repairing the curb & gutter. Friday 12/18/20) – 7:00PM to 6:00AM Temporary Ramp Closure will be in place for I-24 Eastbound Ramp to US-27 Northbound. The ramp will be closed for working on the shoulders. Traffic will be detoured to the Broad Street Exit then onto the US-27 Northbound Ramp from Broad Street. State Troopers are requested for Thursday thru Wednesday during the day and Thursday thru Wednesday during night operations. These requests are weather dependent. RESTRICTIONS: I-124 (US-27) Northbound Exit 1C 4th Street Off Ramp No oversize/over dimensional loads. I-124 (US-27) Southbound Exit 1A – 1B Martin Luther King Blvd Off Ramp No oversize/over dimensional loads I-124 (US-27) Southbound on Ramps from Martin Luther King Blvd No oversize/over dimensional loads
[Dement Construction Company, LLC/Micka/CNP230]
HAMILTON COUNTY TDOT Bridge Inspection on SR-8 (MARKET ST.) both directions from LM 9.64 to LM 10.14: On Sunday, 12/20/20, from 8 AM – 1 PM, The Market Street Bridge will be closed to traffic, both directions, for the quarterly lift operation inspection. Detours will be in place.
HAMILTON COUNTY Utility Work on SR-148 (LOOKOUT MTN. SCENIC HWY.) southbound at LM 0.10: Shoulder and single lane closure between Lula Lake Road and TN-GA State Line. There will be temporary red lights to assist with the closure, as well as signage and cones. Motorists should use caution through the area and be aware of personnel and equipment between 9 AM and 3 PM from 12/15/20 through 12/31/20.
HAMILTON COUNTY Utility Work on SR-321 (OOLTEWAH-RINGGOLD RD.) both directions at LM 2.99: Shoulder and single lane closure between Weidner Lane and Wilson Drive. Signage, cones, and flaggers will be present. Motorists should use caution through the area and be aware of personnel and equipment between 9 AM and 3 PM from 12/15/20 through 12/31/20.
HAMILTON COUNTY SR-29 (US-27) repair of the bridge over Big Soddy Creek (LM 20.6): The contractor will be performing bridge & roadway repair on the SR-29 bridge over Big Soddy Creek. During this report period the contractor will have traffic restricted with two lanes of SR-111 southbound closed. Also, during this report period, the contractor will have two lanes of SR-29 north-bound closed. At least one lane of traffic in both directions shall always remain open.
[Mid-State Construction Company, Inc./Osbonlighter/CNU046]
HAMILTON COUNTY SR-2 (US-64, US-11) improvement of the intersection at Edgmon Road in Collegedale (LM 22.7), including grading, drainage and paving: During this report period, the contractor will be performing grading, drainage and paving. Extra care should be taken while trucks and heavy equipment are entering and exiting the roadway. The roadway may be temporarily restricted to a one lane roadway by flagging operation.
[Talley Construction Company, Inc./Osbonlighter/CNU012]
HAMILTON COUNTY SR-317 (Apison Pike) improvement project from SR-321 (Ooltewah-Ringgold Road) to east of Layton Lane: Lane closures and flagging operations will be required on SR-317, Apison Pike, to install power poles and transfer lines. The flagging operations will be performed on 12/17/20, 12/21/2020, 12/22/2020, and 12/23/20 from 7 AM to 1 PM and 3 PM to 7 PM. Closures will last about 2 hours per location. There will be possible lane closures to allow for paving on Eastview Terrace. There will also be very short lane closures for blasting that will last five minutes or less. The contractor will have intermittent flagging operations during daytime non-peak hours for utility work, delivery of materials and equipment.
[Wright Brothers Construction Company, Inc./Osbonlighter/CNT336]
HAMILTON COUNTY The construction of an S.I.A. to VW: The contractor will be grading, paving, constructing retaining wall(s) and installing signals & lighting on S.I.A. route connecting Ferdinand Piech Way & Volkswagen Dr. The roadway is not open to traffic. The traveling public should be alert to the entrance and exit of construction vehicles from the jobsite onto the connecting roadways. During the weeks of Dec 1st thru Dec 18th, the contractor may have one lane closed while installing storm drainage. Flaggers will be onsite directing traffic.