Construction crews will begin resurfacing the new entrance to Camp Jordan Parkway on Friday, March 30, weather permitting, officials said. The construction may cause traffic delays over the Easter weekend.
The resurfacing will begin with the south lanes on the Bass Pro Shops side. The traffic will then be shifted over to the new travel lanes Monday, April 2. This operation will allow full depth construction of the existing lanes (Chick-fil-A side) of Camp Jordan Parkway.