HAMILTON COUNTY I-24 Utility Work both directions at MM 181: NIGHTTIME (8 pm – 5:30 am) and DAYTIME (8 am – 5:30 pm) shoulder and lane closure on 4th Avenue at the on and off ramps to 1-24. Motorists should reduce speed and be prepared to stop. Trucks, signage, and barrels/cones will be present, 01/23/24 through 06/30/24. [2023-192/197] |
HAMILTON COUNTY I-75 at I-24 Interchange Reconstruction Phase 2: Nightly lane closures will occur on this project, 9 PM to 6 AM, on I-75 North and South between Exit 1 (East Ridge) and Exit 3A (East Brainerd Road/ SR-320) and on I-24 East and West from Germantown Road to Spring Creek Road, MM182 to MM185, for various construction activities. (Note: The contractor is currently scheduled to have nightly lane closures on I-24 East and West between Spring Creek Road and Belvoir Avenue for paving and retaining wall construction. Weather permitting, on Wednesday (5/15) or Thursday (5/16) night the contractor will modify and realign the I-75 North exit ramp (Exit 3A) and I-75 South entrance ramp to and from East Brainerd Road/State Route 320. Part of this work will involve temporarily closing the I-75 South entrance ramp from East Brainerd Road between midnight and 4 AM. Detours will be posted. The week of May 20th the contractor will be making various adjustments to traffic patterns (i.e., narrowing lanes, shifting alignments, etc.) on I-24 East and West between South Moore Road and Spring Creek Road.) Uniformed police officers will be present in these work zones to assist with traffic management and to enforce traffic laws. It may also be necessary to do short duration (15 to 30 minutes) rolling roadblocks during the day for patching potholes, clearing debris or to repair guardrail, attenuators, etc. The left lane on North and South Terrace between Belvoir Avenue and Spring Creek Road will be closed for installation of drainage structures, retaining and noise wall construction. Intermittent daytime non-rush hour lane closures may also be necessary throughout the period on South Terrace and North Terrace to work on utilities, street lighting, and various other construction items. All work is weather permitting. Moore Road and McBrien Road bridges over I 24 are closed as well as the entrance and exit ramps to I-24 between Belvoir Avenue and Moore Road. A continuous flow detour using Belvoir Avenue and Spring Creek Road is in place for local traffic. The closures and detour will be in place for approximately 6 months. RESTRICTIONS: Moore Road and McBrien Road over I-24 closed. I-24 Ramps between Belvoir and Moore Road closed. RESTRICTIONS: Moore Road and McBrien Road over I-24 closed. I-24 Ramps between Belvoir and Moore Road closed. |
HAMILTON COUNTY SR-2 (BRAINERD RD.) Utility Work eastbound at LM 13.4: Multi lane closures on SR-2 from Brookfield Avenue to Lonsdale Drive. Motorists should reduce speed and be prepared to stop. Trucks, signage, flaggers, and barrels/cones will be present, 04/25/24 through 05/23/24 from 9 am to 2 pm. [2023-617] |
HAMILTON COUNTY SR-2 (LEE HWY.) Utility Work both directions at LM 17.8: Shoulder and lane closures on SR-2 (Lee Hwy) between Circle Drive and Conner Lane. Motorists should reduce speed and be prepared to stop. Trucks, signage, flaggers, and barrels/cones will be present, 04/22/24 through 05/23/24 from 9 am – 2 pm. [2024-035] |
HAMILTON COUNTY SR-321 (OOLTEWAH-RINGGOLD RD.) Utility Work both directions at LM 6.47: Intermittent stoppages as well as shoulder and lane closures on SR-321 between Ocoee Street and State Street. Motorists should reduce speed and be prepared to stop. Trucks, signage, flaggers, and barrels/cones will be present, 04/25/24 through 05/22/24 from 9 am – 2 pm. [2024-211] |
HAMILTON COUNTY SR-321 (OOLTEWAH-RINGGOLD RD.) Utility Work both directions from LM 5.19 to LM 5.27: Shoulder and single lane closures on SR-321 from Leyland Drive and Glynn Downing Drive at the intersection of Heathwood Drive and Ooltewah-Ringgold Road. Motorists should reduce speed and be prepared to stop. Trucks, signage, flaggers, and barrels/cones will be present, 04/08/24 through 05/22/24 from 9 am – 2 pm. [2023-729] |
HAMILTON COUNTY SR-8 (WESTSIDE DR.) TDOT Maintenance southbound from LM 5.271 to LM 5.040: Bachman Tunnel from Chattanooga to East Ridge will be closed for sidewalk railing repair from 9pm 05/28/24 to 6am 05/29/24. |
HAMILTON COUNTY I-75 at the Hamilton Place Mall interchange: The SR-153 southbound ramp to I-75 northbound has been reduced to one lane. I-75 northbound has been shifted to the outside reducing to 3 lanes from MM 4.6 to MM 6.0. |
HAMILTON COUNTY SR-111 construction of two small drainage structures at LM 1.7 and LM 2.4: On SR111 Northbound and Southbound from LM 1.5-2.00, traffic will be down to 1 lane on SR111 as the contractor works on the project. The motoring public needs to be careful traveling this direction as workers will be present |
HAMILTON COUNTY SR-29 (US-27) resurfacing from Morrison Springs Road (LM 6.1) to SR-153 (LM 11.6): During this reporting period from 7 PM-6 AM, the contractor will have temporary lane closures on US27 from Morrison Springs Road Exit ramps to past the SR153 Ramps. During these closures, there will be the possibility of the contractor temporarily closing some of these ramps. The motoring traffic is advised to drive carefully while this work is ongoing. |
HAMILTON COUNTY SR-317 (Apison Pike) improvement project from SR-321 (Ooltewah-Ringgold Road) to east of Layton Lane: Lane closures and flagging operations will be required on SR-317, Apison Pike, for utility and grading work. The flagging operations will be performed on 05/16/24, 05/17/24, 05/20/24, 05/21/24 and 05/22/24 from 7 AM to 1 PM and 3 PM to 7 PM. Closures will last about 2 hours per location. The contractor will have intermittent flagging operations during daytime non-peak hours for utility work, delivery of materials and equipment. |