HAMILTON COUNTY I-24 interchange improvement at SR-2 (US-11, US-41, US-72, Broad Street) and SR-58 (Market Street): Williams Street is closed to all traffic at the I-24 underpass to support the installation of new storm drainage structures for the new frontage road. Traffic will still be able to access the ramps to I-24 and US-27, but no through traffic will be allowed on Williams Street between West 21st Street and West 25th Street. Traffic will detour around the closure via West 21st Street and Broad Street. Signs will be posted. The contractor will be working on new bridge construction, storm drainage structures, and utility relocation. The US-27 N on-ramp at William St. has been closed and will remain closed until the new alignment for this ramp is completed. There will be marked detour signs to use the Broad St. US-27 on-ramp. The contractor has opened up the new Broad St. exit off I-24 and closed the existing exit to the Broad St. that is off the US27 S exit. Traffic from US27 S that needs access Broad St. will use the Williams St. exit. There will be detour signs to direct traffic off the Williams St. exit to Broad St. Also, with the The US27 S ramp onto I-24 East will be reduced to 2 lanes with the Williams St. exit still open. This ramp will be this way for several months and the motoring traffic is advised to drive with caution in this area.
[Wright Brothers Construction Company, Inc./Curtis/CNU011]
HAMILTON COUNTY I-24 TDOT Bridge Maintenance both directions at MM 181: Region 2 bridge repair will be performing nighttime work repairing the concrete median wall on Wednesday, February 8th, through Thursday, February 9th, on I-24 at MM 181 over 4th avenue, fast lanes in both directions, beginning at 9:00 PM. One lane will be closed with traffic control in place.
HAMILTON COUNTY I-75 at I-24 Interchange Reconstruction Phase 2: Weather permitting, the contractor will implement single lane closures between the hours of 9 PM until 6 AM Sunday through Thursday, at following locations: I-24 WB MM 185 to MM 183 and North Terrace.
[Wright Brothers Construction Company, Inc./Maj Prj – Blevins/DB2101]
HAMILTON COUNTY I-75 concrete repair from MM 6.6 to MM 12.8: During this reporting period, the contractor will be having lane closures in both directions on I-75 from 9 PM – 6 AM on Sunday throughout the week. During these lane closures, the contractor might have to temporarily close some of the ramps to perform this work.
[Summers-Taylor, Inc./Curtis/CNW046]
HAMILTON COUNTY SR-153 (STATE HWY. 153) Utility Work both directions at LM 10.1: NIGHTTIME Shoulder and multiple lane closures between Grubb Road (Walmart) and Gadd Road. Motorists should reduce speed and be prepared to stop. Police, trucks, signage, and cones/barrels will be present, 02/07/23 through 02/08/23 from 10 pm – 5 am. [2023-021]
HAMILTON COUNTY SR-17 resurfacing from the Georgia state line (LM 0) to SR-2 (US-11, US-64, US-72, LM 2.2): During this reporting period, there will be lane closures during the day as the contractor begins milling the roadway. There will be flaggers stopping traffic as this work is being done. Drivers should expect possible long delays as this work takes place.
[Talley Construction Company, Inc./Curtis/CNW213]
HAMILTON COUNTY SR-317 (Apison Pike) improvement project from SR-321 (Ooltewah-Ringgold Road) to east of Layton Lane: Lane closures and flagging operations will be required on SR-317, Apison Pike, for utility work. The flagging operations will be performed on 02/09/23, 02/10/23, 02/13/23, 02/14/23 and 02/15/23 from 7 AM to 1 PM and 3 PM to 7 PM. Closures will last about 2 hours per location. The contractor will have intermittent flagging operations during daytime non-peak hours for utility work, delivery of materials and equipment.
[Wright Brothers Construction Company, Inc./Osbonlighter/CNT336]
HAMILTON COUNTY SR-8 (E. MAIN ST.) Utility Work both directions from LM 6.39 to LM 6.42: Inside lane closure in both directions on E. Main Street between S. Beech Street and S. Hawthorne Street. Motorists should be prepared to stop and be aware of personnel and equipment when traveling through the work zone. Trucks, signage, drums, cones, and flaggers will be present. Work will begin 02/08/23 at 10 pm and closure will remain in place until completed, approximately 02/09/23 at 5 pm. [2019-543]
HAMILTON COUNTY SR-8 (E. MAIN ST.) Utility Work eastbound from LM 5.94 to LM 6.38: Shoulder and single lane closures from S. Orchard Knob Ave and S. Watkins Street. Motorists should reduce speed and be prepared to stop. Trucks, signage, and barrels will be present, 12/01/22 through 03/31/23 from 9 am – 2 pm. [2022-754]
HAMILTON COUNTY SR-8 (US-127) construction near Palisades Road (LM 15.2) to near Sunset Drive (LM 15.4): The contractor has closed the right lane going up the Signal Mountain Road from LM 15 (about 1/2 mile from Palisades Road) to past Sunset Drive. This closure will be in effect for several months during this project. There will be intermittent lane closures on Signal Mountain Road as the contractor will have flaggers out as they work. Due to the possibility of flaggers stopping traffic, drivers should be aware of possible delays in this area.
[Wright Brothers Construction Company, Inc./Curtis/CNW001]